15.36.150 Haul routes for earth material.
   (A)   The City Engineer may specify the route for moving any earth materials over public streets, whether or not the destination site or origination site of the earth materials is subject to a grading permit. The City Engineer may further specify load limits where, in his or her opinion, the standard load capacity of vehicles used in such hauling would cause excessive damage to streets on the designated route. Any specified route or load limit shall be made in writing and a copy shall be provided to the Traffic Division of the Public Works Department and the Traffic Division of the City Police Department. Deviation from the designated route or load limits shall constitute a violation of this chapter.
   (B)   Any person moving earth materials in violation of the chapter shall be financially responsible for any damage to the public streets and shall pay to the city the cost, as determined by the City Engineer, of repairing such damage or shall repair the damage to the satisfaction of the City Engineer.
   (C)   At least 24 hours before moving the earth materials is to commence, the applicant shall notify the City of Corona Public Works Department, Traffic Division and Inspection Division.
(Ord. 3378 § 5 (part), 2023; Ord. 2568 § 1, 2002.)