CHAPTER 14.28
ABANDONMENT
Sections
   14.28.010   Notification – Cleanup.
   14.28.020   Procedure.
   14.28.030   Well requirements.
   14.28.040   Surface requirements.
   14.28.050   Conversion to water well.
14.28.010 Notification – Cleanup.
   Immediately upon completion of drilling or redrilling operations of an oil well, the permittee shall notify the Agency of such completion, and the permittee, its agents or employees shall immediately remove from the leasehold or property all oil rags, waste material and debris placed therein by the permittee during its operations and shall repair any and all damage done by it to sidewalks, alleys, parkways, streets and public rights-of-way relating to the operations and shall remove all oil and debris which may have collected on the property by reason of such operations.
(`78 Code, § 14.28.010.)
14.28.020 Procedure.
   It shall be the responsibility of the Secretary to determine whether the drill site and all facilities pertinent thereto have been restored as nearly as practicable to their original condition and in conformity with the regulations of this title, including, but not limited to, the requirements contained in §§ 14.28.030 through 14.28.050.
(`78 Code, § 14.28.020.)
Loading...