12.28.200 Damage – Report.
   The permittee shall report any damage to any property, public or private, as a result of moving or having upon city public streets or places any overload. The report shall be presented to the Director within 24 hours after such damage results. The report shall include the location, cause and description of any such damages and the names of any witnesses thereto and shall bear the signature of the permittee or his or her duly authorized agent.
(`78 Code, § 12.28.180.) (Ord. 3061 § 1 (part), 2010; Ord. 2138 § 1 (part), 1992.)