During construction of any improvement, all streets shall, at the expense of the permittee, be thoroughly cleaned of all rubbish, excess earth, rock and other debris resulting from such construction. From time to time, as may be ordered by the City Engineer, and in any event immediately after completion of the improvement, the permittee shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the construction. If the permittee fails to do so within 24 hours after having been notified, the work may be done by the city and the cost thereof charged to the permittee. Whenever it may be necessary for the permittee to excavate through any landscaped area, the area shall be reestablished in a like manner after the excavation has been backfilled as required. All construction and maintenance work shall be done in a manner designed to leave the area clean of earth and debris and in a condition as nearly as possible to that which existed before such work began. The permittee shall not remove, even temporarily, any existing trees or shrubs without first obtaining the consent of the City Engineer.
(`78 Code, § 12.12.140.) (Ord. 3378 § 4 (part), 2023.)