§ 240.08 Notice Requirements
   (a)   For any lead abatement, interim controls, lead-safe maintenance practices or lead-safe renovation work in a residential unit, child day-care facility or school, the owner shall provide seven (7) days advance written notice to all occupants of residential structures, or all parents, students, teachers, and staff of child day-care facilities or schools from which lead-based paint is to be removed, and to all occupants of residential structures which are within thirty (30) feet of the residential structure, child day-care facility or school from which the lead-based paint is to be removed. The notice shall be as prescribed by the Commissioner and shall include, at a minimum, the address at which the lead-based paint will be removed, the date of commencement of the lead-based paint removal, the anticipated length of time to complete the removal, and the method by which the lead-based paint will be removed. The notice shall include a copy of an EPA-approved lead hazard information pamphlet.
   (b)   The notice required under this section does not relieve any person from compliance with any other notice requirements under state or federal law, including when notice is required by a hazard control order.
(Ord. No. 747-2019. Passed 7-24-19, eff. 7-26-19)