The percentage of vision-obscuring solid materials visible when screening is viewed horizontally from grade level – or from the level of the roof at the base of the screening in the case of roof-mounted screening – to the top of the screening upon installation, or, in the case of landscape screening, starting no later than twelve (12) months after installation.
(Ord. No. 3077-A-89. Passed 6-17-91, eff. 7-27-91)