(a) Fees for the examination of plans and applications for the issuance of permits, variances, and for the original inspection and permit to operate for the installation and modification of any air contaminant source or control equipment, within the jurisdiction of this code, and renewal of permits to operate shall be as follows:
Permit to Install or Modify and Initial Permit to Operate and Variance
|
Renewal Permit to Operate
|
Permit to Install or Modify and Initial Permit to Operate and Variance
|
Renewal Permit to Operate
| |
(1) Fuel-burning Equipment for Each Unit. The fee should be based upon the maximum designed heat input capacity, | ||
A. Of a heat input capacity of less than 2,500,000 BTU/HR | $100.00 | $50.00 |
B. Of a heat input capacity of 2,500,000 BTU/HR and less than 10,000,000 BTU/HR | $200.00 | $100.00 |
C. Of a heat input capacity of 10,000,000 BTU/HR and less than 25,000,000 BTU/HR | $500.00 | $250.00 |
D. Of a heat input capacity of 25,000,000 BTU/HR and less than 50,000,000 BTU/HR | $1,500.00 | $750.00 |
E. Of a heat input capacity of 100,000,000 or more | $2,000.00 | $1,000.00 |
Total fees for all fuel-burning equipment, except major sources, in the above schedule in each boiler house (room) shall not exceed $1,000.00 for renewal of permits to operate. | ||
(2) Incinerators for Each Unit. | ||
A. Having a primary furnace volume of 15 cubic feet or less | $60.00 | $30.00 |
B. Having a primary furnace volume of 15 cubic feet but less than 25 cubic feet | $100.00 | $50.00 |
C. Having a primary furnace volume of 25 cubic feet but less than 35 cubic feet | $140.00 | $75.00 |
D. Having a primary furnace volume of 35 cubic feet but less than 50 cubic feet | $200.00 | $100.00 |
E. Having a primary furnace volume of 50 cubic feet but less than 100 cubic feet | $300.00 | $150.00 |
F. Having a primary furnace volume of 100 cubic feet but less than 200 cubic feet | $1,200.00 | $600.00 |
G. Having a primary furnace volume of 200 cubic feet or more | $2,000.00 | $1,000.00 |
(3) Process Equipment. Fee shall be based upon the value of X as determined from the following equation: X = Process Weight in pounds per hour + Exhaust Air Ventilation in actual cubic feet per minute. | ||
A. For values of X of 1,000 or less | $80.00 | $40.00 |
B. For values of X over 1,000 but less than 10,000 | $200.00 | $100.00 |
C For values of X over 10,000 but less than 50,000 | $400.00 | $200.00 |
D. For values of X over 50,000 but less than 100,000 | $800.00 | $400.00 |
E. For values of X over 100,000 but less than 500,000 | $1,200.00 | $600.00 |
F. For values of X over 500,000 but less than 1,000,000 | $1,600.00 | $800.00 |
G For values of X of $1,000,000 or more | $2,000.00 | $1,000.00 |
Total fees for all process equipment, except major sources, in above schedule in each work room, shall not exceed $500.00 for renewal of permits to operate. | ||
(4) Process and Fuel-burning Equipment. Fee shall be based upon the value of Y as determined from the following equation: Y = Heat input in million of BTU per hour + Exhaust Air Ventilation in actual cubic feet per minute x 1/1000 | ||
A. For values of Y of 1, or less | $80.00 | $40.00 |
B. For values of Y over 1, but less than 10 | $200.00 | $100.00 |
C. For values of Y over 10, but less than 20 | $300.00 | $150.00 |
D. For values of Y over 20, but less than 40 | $600.00 | $300.00 |
E. For values of Y over 40, but less than 60 | $1,000.00 | $500.00 |
F. For values of Y over 60, but less than 80 | $1,400.00 | $700.00 |
G. For values of Y over 80, but less than 100 | $1,800.00 | $900.00 |
H. For values of Y over 100 or more | $2,000.00 | $1,000.00 |
Total fees for all process and fuel-burning equipment, except major sources, in the above schedule in each work room, shall not exceed $500.00 for renewal of permits to operate. | ||
(5) Control Equipment and/or Appurtenances. A separate permit shall be required and shall carry the same fees as the air contaminant source for which it is installed or modified. A separate permit and permit fee shall not be required when the control equipment or appurtenances are installed as an integral part of the source or concurrently with the installation or modification of the source. | ||
(6) Any Other Air Contaminant Source. Any other air contaminant source and not included in the above schedule | $100.00 | $50.00 |
(b) Fees for the examination of applications and for the issuance of other permits, required by this code, shall be as follows: For each permit for a given location:
(1) For open burning, fifty dollars ($50.00);
(2) For sandblasting of buildings and other structures, fifty dollars ($50.00);
(3) For spraying of asbestos containing products, fifty dollars ($50.00).
(c) Where the nature of any process or operation or the design of any equipment is such as to permit more than one (1) interpretation of the values of X and/or Y in subsection (a) of this section, the interpretation that results in the highest fee shall apply.
(Ord. No. 2393-02. Passed 2-3-03, eff. 2-3-03)