(A) General permit. The Town Engineer shall determine the life of the general permit, but it shall not exceed 1 year, as stated in the permit. The Town Engineer may revoke this permit at any time based on unsatisfactory performance.
(B) Project permit. Each project permit shall be in full force and effect for 30 days from the date of issue, unless otherwise stated in the permit.
(C) Time limits. The Town Engineer may determine that a specific project may require more than 30 days for completion and may permit such time as deemed necessary for completion. He or she may determine the necessity for a time extension during the life of the project permit, and thereby amend the permit.
(D) Time for excavation, backfillinq and compaction of trenches across rights-of-way. The Town Engineer shall determine time for excavation, backfilling and compaction across rights-of-way
(2001 Code, § 7-10-8)