The building commissioner is authorized to issue permits under this chapter. Permit fees shall be charged as follows:
(a) Connections to public sewers and extensions of private drains.
Six-inch diameter and smaller.....$75.00
Eight-inch diameter.....$125.00
Ten-inch to 16-inch diameter.....$175.00
18-inch to 21-inch diameter.....$225.00
24-inch and larger.....$300.00
Connections by public agencies of branch sewers or catch basin drains to main sewers.....$125.00 – $450.00
(b) Repairs and/or additions to existing sewers up to 20 feet.
Six-inch diameter and smaller.....$65.00
Eight-inch diameter.....$100.00
Over eight-inch diameter.....$125.00
Repairs or adjustment of a sewer structure in public way or on private property.....$50.00
Repair of an existing flood control system on private property.....$30.00
(c) [Reserved.]
(d) Seal permits (demolition).....$125.00
(e) Miscellaneous permit fees:
Sump pump only installation.....$50.00
Sump pump and drain tile installation.....$100.00
Flood control and overhead conversion.....$100.00
Inspection manholes (per manhole).....$100.00
Each townhouse/single-family residence unit of a planned development or subdivision (each house).....$65.00
Pumping water from basements of residential buildings up to six flat apartment buildings.....$30.00
Minimum.....$100.00
Stubs (per stub).....$50.00
Installation of testing equipment in a manhole....$150.00
(f) Fees for videotaping, cleaning, lining and inspections of public sewers:
From zero to 500 linear feet of sewer.....$125.00
From 501 to 1,000 linear feet of sewer.....$200.00
Over 1,000 linear feet of sewer.....$275.00
(g) Other fees. For sewer-related or building drain-related work applied for pursuant to this chapter with no associated permit fee, including the approved use of a pipe diameter not specified in this section, the building commissioner is authorized to assess a permit fee for such work, based on the city's reasonable cost of issuing and administering the permit, which in no case shall be less than $450.