BUILDING CODE AND RELATED EXCERPTS OF THE MUNICIPAL CODE OF CHICAGO
DIVISION 1 - ADMINISTRATION
DIVISION 2 - DEFINITIONS
DIVISION 3 - USE AND OCCUPANCY CLASSIFICATIONS
DIVISION 4 - SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
DIVISION 5 - GENERAL BUILDING HEIGHTS AND AREAS
DIVISION 6 - TYPES OF CONSTRUCTION
DIVISION 7 - FIRE-RESISTANCE-RATED CONSTRUCTION
DIVISION 8 - INTERIOR FINISHES (NA)
DIVISION 9 - FIRE PROTECTION SYSTEMS
DIVISION 10 - MEANS OF EGRESS
DIVISION 11 - ACCESSIBILITY
DIVISION 12 - INTERIOR ENVIRONMENT
DIVISION 13 - ENERGY EFFICIENCY AND ENVIRONMENTAL PROTECTION
DIVISION 14 - EXTERIOR WALLS (NA)
DIVISION 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES (NA)
DIVISION 16 - STRUCTURAL DESIGN
DIVISION 17 - STRUCTURAL TESTS AND SPECIAL INSPECTIONS
DIVISION 18 - SOILS AND FOUNDATIONS
DIVISION 19 - CONCRETE
DIVISION 20 - ALUMINUM (NA)
DIVISION 21 - MASONRY
DIVISION 22 - STEEL
DIVISION 23 - WOOD
DIVISION 24 - GLASS AND GLAZING (NA)
DIVISION 25 - GYPSUM BOARD AND PLASTER (NA)
DIVISION 26 - PLASTIC (NA)
DIVISION 27 - ELECTRICAL
DIVISION 28 - MECHANICAL SYSTEMS
CHAPTER 18-28 MECHANICAL SYSTEMS*
Article I. Administration (18-28-101 et seq.)
Article II. Definitions (18-28-201 et seq.)
Article III. General Regulations (18-28-301 et seq.)
Article IV. Ventilation (18-28-401 et seq.)
Article V. Exhaust Systems (18-28-501 et seq.)
Article VI. Duct Systems (18-28-601 et seq.)
Article VII. Combustion Air (18-28-701 et seq.)
Article VIII. Chimneys and Vents (18-28-801 et seq.)
Article IX. Specific Appliances, Fireplaces and Solid Fuel-Burning Equipment (18-28-901 et seq.)
Article X. Boilers, Water Heaters and Pressure Vessels (18-28-1001 et seq.)
Article XI. Refrigeration (18-28-1101 et seq.)
Article XII. Hydronic Piping (18-28-1200 et seq.)
18-28-1200 General.
18-28-1201.1 Scope.
18-28-1201.2 Pipe sizing.
18-28-1202 Material.
18-28-1202.1 Piping.
18-28-1202.2 Used materials.
18-28-1202.3 Material rating.
18-28-1202.4 Piping materials standards.
18-28-1202.5 Pipe fittings.
18-28-1202.6 Valves.
18-28-1202.7 Flexible connectors, expansion and vibration compensators.
18-28-1203 Joints and Connections.
18-28-1203.1 Approval.
18-28-1203.1.1 Joints between different piping materials.
18-28-1203.2 Preparation of pipe ends.
18-28-1203.3 Joint preparation and installation.
18-28-1203.3.1 Brazed joints.
18-28-1203.3.2 Mechanical joints.
18-28-1203.3.3 Soldered joints.
18-28-1203.3.4 Solvent-cemented joints.
18-28-1203.3.5 Threaded joints.
18-28-1203.3.6 Welded joints.
18-28-1203.3.7 Grooved and shouldered joints.
18-28-1203.4 ABS plastic pipe.
18-28-1203.5 Brass pipe.
18-28-1203.6 Brass tubing.
18-28-1203.7 Copper or copper-alloy pipe.
18-28-1203.8 Copper or copper-alloy tubing.
18-28-1203.8.1 Flared joints.
18-28-1203.9 CPVC plastic pipe.
18-28-1203.10 Polybutylene plastic pipe and tubing.
18-28-1203.10.1 Heat-fusion joints.
18-28-1203.11 Cross-linked polyethylene (PEX) plastic tubing.
18-28-1203.11.1 Compression-type fittings.
18-28-1203.11.2 Plastic-to-metal connections.
18-28-1203.12 PVC plastic pipe.
18-28-1203.13 Steel pipe.
18-28-1203.14 Steel tubing.
18-28-1204 Pipe Insulation.
18-28-1204.1 Insulation characteristics.
18-28-1204.2 Required thickness.
18-28-1205 Valves.
18-28-1205.1 Where required.
18-28-1205.1.1 Heat exchangers.
18-28-1205.1.2 Central systems.
18-28-1205.1.3 Pressure vessels.
18-28-1205.1.4 Pressure-reducing valves.
18-28-1205.1.5 Equipment and appliances.
18-28-1205.1.6 Expansion tanks.
18-28-1205.2 Reduced pressure.
18-28-1206 Piping Installation.
18-28-1206.1 General.
18-28-1206.1.1 Prohibited tee applications.
18-28-1206.2 System drain down.
18-28-1206.3 Protection of potable water.
18-28-1206.4 Pipe penetrations.
18-28-1206.5 Clearance to combustibles.
18-28-1206.6 Contact with building material.
18-28-1206.7 Water hammer.
18-28-1206.8 Steam piping pitch.
18-28-1206.9 Strains and stresses.
18-28-1206.9.1 Flood hazard.
18-28-1206.10 Pipe support.
18-28-1206.11 Condensation.
18-28-1207 Transfer Fluid.
18-28-1207.1 Flash point.
18-28-1207.2 Makeup water.
18-28-1208 Tests.
18-28-1208.1 General.
18-28-1209 Embedded Piping.
18-28-1209.1 Materials.
18-28-1209.2 Pressurizing during installation.
18-28-1209.3 Embedded joints.
18-28-1209.3.1 Steel pipe joints.
18-28-1209.3.2 Copper tubing joints.
18-28-1209.3.3 Polybutylene joints.
18-28-1209.4 Not embedded related piping.
Article XIII. Fuel Oil Piping and Storage (18-28-1301 et seq.)
Article XIV. Fuel-Gas Piping (18-28-1401 et seq.)
Article XV. Solar Systems (18-28-1501 et seq.)
DIVISION 29 - PLUMBING SYSTEMS
DIVISION 30 - ELEVATORS AND CONVEYING SYSTEMS
DIVISION 31 - SPECIAL CONSTRUCTION (NA)
DIVISION 32 - ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
DIVISION 33 - SAFEGUARDS DURING CONSTRUCTION
DIVISION 34 - EXISTING STRUCTURES
DIVISION 35 - REFERENCED STANDARDS

You are viewing an archived code

Loading...
18-28-1206.1.1  Prohibited tee applications.
   Fluid in the supply side of a hydronic system shall not enter a tee fitting through the branch opening.
18-28-1206.2  System drain down.
   Hydronic piping systems shall be designed and installed to permit the system to be drained. Where the system drains to the plumbing drainage system, the installation shall conform to the requirements of the plumbing code.
18-28-1206.3  Protection of potable water.
   The potable water system shall be protected from backflow in accordance with the plumbing code.
18-28-1206.4  Pipe penetrations.
   Openings for pipe penetrations in walls, floors or ceilings shall be larger than the penetrating pipe. Openings through concrete or masonry building elements shall be sleeved. The annular space surrounding pipe penetrations shall be protected in accordance with the building code.
18-28-1206.5  Clearance to combustibles.
   A pipe in a hydronic piping system in which the exterior temperature exceeds 250°F (121°C) shall have a minimum clearance of 1 inch (25.4 mm) to combustible materials.
Loading...