Skip to code content (skip section selection)
Compare to:
Chicago Overview
Prior Chicago Building Code
BUILDING CODE AND RELATED EXCERPTS OF THE MUNICIPAL CODE OF CHICAGO
DIVISION 1 - ADMINISTRATION
DIVISION 2 - DEFINITIONS
DIVISION 3 - USE AND OCCUPANCY CLASSIFICATIONS
DIVISION 4 - SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
DIVISION 5 - GENERAL BUILDING HEIGHTS AND AREAS
DIVISION 6 - TYPES OF CONSTRUCTION
DIVISION 7 - FIRE-RESISTANCE-RATED CONSTRUCTION
DIVISION 8 - INTERIOR FINISHES (NA)
DIVISION 9 - FIRE PROTECTION SYSTEMS
DIVISION 10 - MEANS OF EGRESS
DIVISION 11 - ACCESSIBILITY
DIVISION 12 - INTERIOR ENVIRONMENT
DIVISION 13 - ENERGY EFFICIENCY AND ENVIRONMENTAL PROTECTION
Subdivision 1301 - General
Subdivision 1302 - Environmental Protection
CHAPTER 8-32 NOISE AND VIBRATION CONTROL
CHAPTER 11-4 ENVIRONMENTAL PROTECTION AND CONTROL
ARTICLE I. GENERAL PROVISIONS (11-4-010 et seq.)
ARTICLE II. AIR POLLUTION CONTROL (11-4-580 et seq.)
ARTICLE III. BOILERS AND UNFIRED PRESSURE VESSELS (11-4-860 et seq.)
ARTICLE IV. CONTROL OF EMISSIONS OF ORGANIC SUBSTANCES (11-4-990 et seq.)
ARTICLE V. RESERVED (11-4-1000 et seq.)
ARTICLE VI. WASTE CONTROL (11-4-1020 et seq.)
ARTICLE VII. HAZARDOUS MATERIALS EMERGENCY PREPAREDNESS REQUIREMENTS* (11-4-1100 et seq.)
ARTICLE VIII. POLLUTION OF WATERS* (11-4-1410 et seq.)
ARTICLE IX. SOLID AND LIQUID WASTE CONTROL (11-4-1490 et seq.)
ARTICLE X. PHOSPHORUS CONTROL (11-4-1610 et seq.)
ARTICLE XI. SOLID WASTE MANAGEMENT REVIEW COMMITTEE (11-4-1640 et seq.)
ARTICLE XII. ELECTRIC UTILITY FRANCHISE CONTROL AND ENFORCEMENT (11-4-1680 et seq.)
ARTICLE XIII. RECYCLING (11-4-1820 et seq.)
ARTICLE XIV. REPROCESSABLE CONSTRUCTION/DEMOLITION MATERIAL (11-4-1905 et seq.)
ARTICLE XVI. FLAMMABLE LIQUID TANK REGULATIONS (11-4-2090 et seq.)
ARTICLE XVII. FUEL AND LUBRICATION FACILITIES (11-4-2140 et seq.)
ARTICLE XVIII. ASBESTOS, SANDBLASTING, AND GRINDING STANDARDS (11-4-2150 et seq.)
ARTICLE XIX. RESERVED (11-4-2230 et seq.)
ARTICLE XX. RECYCLING FACILITY AND URBAN FARM ACCESSORY COMPOSTING PERMITS* (11-4-2510 et seq.)
ARTICLE XXI. RESERVED.
ARTICLE XXII. INVASIVE SPECIES CONTROL (11-4-3000 et seq.)
ARTICLE XXIII. RESERVED
CHAPTER 11-5 REDUCTION AND RECYCLING PROGRAM*
DIVISION 14 - EXTERIOR WALLS (NA)
DIVISION 15 - ROOF ASSEMBLIES AND ROOFTOP STRUCTURES (NA)
DIVISION 16 - STRUCTURAL DESIGN
DIVISION 17 - STRUCTURAL TESTS AND SPECIAL INSPECTIONS
DIVISION 18 - SOILS AND FOUNDATIONS
DIVISION 19 - CONCRETE
DIVISION 20 - ALUMINUM (NA)
DIVISION 21 - MASONRY
DIVISION 22 - STEEL
DIVISION 23 - WOOD
DIVISION 24 - GLASS AND GLAZING (NA)
DIVISION 25 - GYPSUM BOARD AND PLASTER (NA)
DIVISION 26 - PLASTIC (NA)
DIVISION 27 - ELECTRICAL
DIVISION 28 - MECHANICAL SYSTEMS
DIVISION 29 - PLUMBING SYSTEMS
DIVISION 30 - ELEVATORS AND CONVEYING SYSTEMS
DIVISION 31 - SPECIAL CONSTRUCTION (NA)
DIVISION 32 - ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY
DIVISION 33 - SAFEGUARDS DURING CONSTRUCTION
DIVISION 34 - EXISTING STRUCTURES
DIVISION 35 - REFERENCED STANDARDS

You are viewing an archived code

Loading...
11-4-860  Definitions.
   Definitions relating to Article III will be found in Article I, Section 11-4-120.
(Prior code § 17-2A.1)
11-4-870  Boiler standards.
   The material and construction of boilers shall be in accordance with the American Society of Mechanical Engineers Rules for the Construction of Stationary Boilers, as follows:
   Section I. Power Boilers, dated 1977 or later;
   Section II. Material Specifications, dated 1977 or later.
   Part A. Ferrous.
   Part B. Nonferrous;
   Section III. Nuclear Vessels, dated 1977 or later;
   Section IV. Heating Boilers, dated 1977 or later;
   Section IX. Welding Qualifications, dated 1977 or later;
   Section X. Fiberglass and Reinforced Plastic Pressure Vessels, dated 1977 or later;
   Section XI. In-Service Inspection of Nuclear Reactor Coolant System, dated 1977 or later.
(Prior code § 17-2A.2)
11-4-880  Tanks and other vessels – Standards.
   The material and construction of tanks and other vessels under pressure shall be in accordance with the American Society of Mechanical Engineers Rules for the Construction of Unfired Pressure Vessels, Section VIII, Pressure Vessels, Division 1 dated 1977, Division 2, dated 1977 or later.
(Prior code § 17-2A.3)
11-4-890  Plans and specifications.
   Before any owner or agent shall proceed with the installation or alteration of any boiler or unfired pressure vessel, he shall place on file in the department of buildings plans and specifications of the same. Upon approval of such plans and specifications, a duplicate set of which shall be left on file in said office and the payment of fees and hereinafter provided, the department of buildings shall issue a permit for the installation or alteration of such apparatus.
   If such owner or agent shall proceed with the installation of any boiler or unfired pressure vessel and shall fail to place on file with the department of buildings plans and specifications of the same and shall fail to obtain a permit for the installation of such apparatus, he shall be liable to a fine of $25.00 for each day on which he shall have operated such installation without said permit, and each day's violation shall constitute a separate offense.
   It shall be unlawful for any person to use any boiler or tank or tanks subject to pressure, other than the pressure in the city water mains, until he shall first have procured a certificate from the department of buildings that such apparatus may be safely used. If such owner, agent or person using a boiler or tank shall fail to notify the said department of buildings of his intention to make any alteration or enlargement of such boiler or tank and shall fail to file plans and specifications for the enlargement or alteration of the same and shall proceed to make such alterations or enlargement without a permit thereof, he shall be liable to a fine of $100.00 for each day on which he shall have prosecuted such alterations or enlargement without said permit and each day's violation shall constitute a separate offense.
(Prior code § 17-2A.4; Amend Coun. J. 9-23-89, p. 4604; Amend Coun. J. 12-4-02, p. 99026, § 2.4; Amend Coun. J. 11-13-07, p. 14999, Art. II, § 1)
11-4-900  Inspection – Hydrostatic tests.
   All boilers, tanks, jacketed kettles, generators or other apparatus used for generating or transmitting steam for power or using steam under pressure for power or using steam under pressure for heating or steaming purposes, and all other tanks, jacketed kettles and reservoirs under pressure of any kind, shall be inspected under the authority or pursuant to the mandate of the building commissioner as often as the commissioner deems necessary. If a hydrostatic pressure test is deemed necessary, the hydrostatic pressures used in such test shall not exceed the maximum working pressure of the apparatus being tested by more than 50 percent and a careful external and internal examination of the apparatus shall be made prior to administering the test. In all cases where a hydrostatic pressure test is used, an internal examination of such apparatus shall be made after the test is administered.
(Prior code § 17-2A.5; Amend Coun. J. 9-13-89, p. 4604; Amend Coun. J. 12-2-09, p. 78837, Art. 7, § 1; Amend Coun. J. 2-22-17, p. 43916, Art. VIII, § 15)
Loading...