1038.05 CONNECTION PROCEDURES.
   (a)   No sanitary sewer connection will be made to a single family unit or commercial building until the rough interior plumbing has been completed, inspected and approved and all sources of ground or subsurface water from the area of the structure have been drained to an acceptable discharge point.
   (b)   No water taps will be permitted until the connection into the sanitary sewer has been made. If sanitary sewer service is not available to the property, no water tap will be permitted until a septic tank permit is obtained from the Warren County or Montgomery County Health Department, whichever is applicable.
   (c)   All construction shall be performed in accordance with the requirements and specifications of the Water Division and the Sewer Division set forth in this chapter, and all work shall be inspected and approved by an authorized inspector of the Department of Service.
(Ord. 9-87. Passed 3-9-87.)