CHAPTER 925
Building Sewers and Connections
925.01   Permit required.
925.02   Permit time limit; extension of time; nonreturnable permit fee.
925.03   Cost and expenses; City held harmless.
925.04   One sewer for two buildings.
925.05   Old sewers for new buildings.
925.06   Material standards; joints.
925.07   Slope; diameter.
925.08   Installation.
925.09   Gravity flow or artificial lifting.
925.10   Excavation; pipe laying; backfill; inspections.
925.11   Joints and materials.
925.12   Cleanout.
925.13   Testing.
925.14   Connection to public sewer.
925.15   Connection to be supervised.
925.16   Excavation warnings; restoration of public property.
925.99   Penalty.
CROSS REFERENCES
   Compulsory sewer connections - see Ohio R.C. 729.06
   Regulations to control house sewers and connections - see Ohio R.C. 729.51
   Barricades and warning lights; abandoned excavations - see GEN. OFF. 521.03
   Superintendent defined - see S.U. & P.S. 921.03
   Sewage rates for residential, commercial and industrial use - see S.U. & P.S. 929.03