925.10 EXCAVATIONS; PIPE LAYING; BACKFILL; INSPECTIONS.
   (a)   All excavations required for the installation of the building sewer shall be open trench work unless otherwise approved by the City Engineer.
 
   (b)   Pipe laying and backfill shall be performed in accordance with “Construction and Material Specifications” of the State Department of Transportation. Sewer lines shall be bedded with 4" of pea gravel and the pipe shall be backfilled to the top with Pea Gravel, No. 8 crushed limestone or ODOT Item 304 Crushed Limestone. No backfill shall be placed until the work has been inspected
 
   (c)   The City Engineer or any employee of the City Engineer's Department shall make inspection within twenty-four hours after notice is given to the City Engineer that the installation is ready for inspection, unless such inspection would fall on a Saturday, Sunday, or holiday. In such an event, the inspection would be conducted on the next regular working day from Monday through Friday for Bryan City Engineering Department employees following that Saturday, Sunday or holiday.
(Ord. 9-2008. Passed 3-3-08.)