925.12 CLEANOUT.
   Six inch cleanouts shall be installed five feet outside of the building foundation wall and shall extend to the ground surface. A removable waterproof cap shall be placed at the top of the cleanout. Materials for the cleanout shall conform to Section 925.06.
(Ord. 9-2008. Passed 3-3-08.)