Section
1342.01 Intent
1342.02 New construction; plans and specifications; maintenance and inspection contracts
1342.03 Inspection fee schedule
1342.04 Existing buildings; plans and specifications; maintenance and inspection contracts
1342.05 Compliance required prior to issuance of building permits
1342.06 Continuous inspection
1342.07 Notice, maintenance orders and corrective action
1342.08 Bond required
1342.09 Prohibition against faulty operation
1342.10 Improper discharge prohibited
1342.11 Connections to sewers required when available
1342.12 License required
1342.99 Penalty
Cross-reference:
Connection with sanitary sewers required when available, see § 1042.02
Editor’s note:
This Chapter 1342 was formerly Chapter 1488 of the Building and Housing Code, which was recodified by Ordinance 62-07, passed June 4, 2007.
Statutory reference:
Regulations to control house sewers and connections to sewerage system, see Ohio R.C. 729.51
Untreated sewage, see Ohio R.C. 3701.59