Section
General Provisions
50.001 Short title
50.002 Definitions
50.003 Director of Wastewater Treatment and Sewer Lines
50.004 Ground water as a potable water
User Charges
50.015 Basic charges for all users of city sewers
50.016 Separate water supply
50.017 Meter deduction
50.018 New users
50.019 Surcharge to industrial users
50.020 Annual review
50.021 Lien rights, collection and occupancy permit
50.022 Service disconnected
50.023 Sewer lateral repair program installation and connection
Sewer Extensions
50.035 Construction contracts
50.036 Approved plans and permits
50.037 Certification
50.038 Testing
50.039 “Record” drawings
50.040 Final inspection
50.041 Sewer maintenance bond
50.042 Pump station design standards
Use of Public Sewers
50.055 Pretreatment
50.056 Use of public sewer
Building Sewers, Permits and Connections
50.070 Costs
50.071 Permits
50.072 Connection fees
Inspections
50.085 Inspections
50.086 Powers and authority of inspectors
Collection, Deposit and Lien
50.100 Supervisor of sewer collections
50.101 Lien rights
Construction Requirements
50.115 Material requirements
50.116 Connections to the city sewer
50.117 Testing
50.118 Connection
50.999 Penalty