§ 50.085 INSPECTIONS.
   Upon payment of the permit fee, the inspector shall make the following inspections of each residence to be connected to the sewage system.
   (A)   An inspection shall be made of the building plumbing connection at the time the sewer ditch is opened and the connection is made to the sewer system to determine proper grade, alignment and connection.
   (B)   An inspection shall be made before the fill is put around the foundation and while the tile is still exposed around the foundation to see that there has been no connection of such drain tile with the sanitary sewer system.
   (C)   A third and final inspection shall be made after the eaves-troughs and downspouts have been installed to see that there is no connection of the aforesaid with the sanitary sewer.
   (D)   The provisions of this chapter relating to excavations in streets shall be complied with in making excavations in street or other public places for sewer connections.
(1960 Code, § 38-9-1) (Ord. 4042, passed 2-20-1984)