9-5-9: ENGINEER'S/SURVEYOR'S CERTIFICATION:
For all topographic surveys submitted, the engineer or surveyor of record must sign a topographic survey certification for occupancy, which may be picked up in the planning and development department and reads as follows:
I, (name) , A (surveyor/engineer) DO HEREBY CERTIFY THAT THE TOPOGRAPHIC SURVEY FOR LOT (number) OF THE (subdivision) SHOWN ON THIS SURVEY WAS DONE BY ME OR UNDER MY DIRECT SUPERVISION. I FURTHER CERTIFY THAT THE ELEVATIONS FOR ALL LOT CORNERS, ALL DRAINAGE "BREAK POINTS", ALL DRAINAGE STRUCTURE FRAMES AND THE TOP OF ALL CURBS (OPPOSITE THE FRONT LOT CORNERS OF THE HEREIN IDENTIFIED LOT) ARE DUPLICATED ON THE SURVEY AND ARE WITHIN TWO (2) TENTHS OF A FOOT OF THOSE SHOWN ON THE APPROVED GRADING PLAN OR A REVISED GRADING PLAN. I ALSO CERTIFY THAT ALL REAR LOT LINE SLOPES, OR SLOPES IN DRAINAGE SWALES DESIGNED TO CARRY OVERLAND FLOW FROM ADJOINING PROPERTIES, ARE WITHIN 20% OF THE GRADE DIFFERENCES BETWEEN THE ELEVATION POINTS SHOWN ON THE APPROVED GRADING PLANS (SHEET              OF             ) PREPARED BY                 (ENGINEER) DATED                                 (DATE), LAST REVISED                               (DATE OF LAST REVISION).
(Ord. 2014-46, 6-3-2014; amd. Ord. 2020-56, 6-16-2020)