CHAPTER 52: ELECTRIC LIGHT AND POWER
Section
General Provisions
   52.01   Superintendent of Electric Light and Power System
   52.02   Shutting off power for alterations, repairs, and the like
   52.03   Moving of buildings; cost
   52.04   Tampering with town electric facilities; civil penalties and costs
Connection Regulations
   52.10   Application
   52.11   Connection fees
   52.12   Meters
   52.13   Service outside town limits
Rates and Charges
   52.25   Schedule of rates and charges
   52.26   Deposit required for service; rate schedule
   52.27   When meters read, bills payable
   52.28   Disconnection for late payment
 
   52.99   Penalty