Section
General Provisions
52.01 Superintendent of Electric Light and Power System
52.02 Shutting off power for alterations, repairs, and the like
52.03 Moving of buildings; cost
52.04 Tampering with town electric facilities; civil penalties and costs
Connection Regulations
52.10 Application
52.11 Connection fees
52.12 Meters
52.13 Service outside town limits
Rates and Charges
52.25 Schedule of rates and charges
52.26 Deposit required for service; rate schedule
52.27 When meters read, bills payable
52.28 Disconnection for late payment
52.99 Penalty
GENERAL PROVISIONS
The town reserves the right at any time to turn off electric power in case of accident, or for the purposes of making connections, alterations, or repairs.
('70 Code, Ch. F, Art. III § 12)
Cross-reference:
Discontinuance of service for tampering with town electric facilities, see § 52.04
Discontinuance of service for non-payment of bill, see § 52.28
Loading...