8-2-6-1: PRETREATMENT FACILITIES:
   A.   Each user that discharges non-residential source waste shall provide wastewater treatment and best management practices as necessary to comply with this chapter and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in section 8-2-5 of this chapter within the time limitations specified by USEPA, the state, or the pretreatment coordinator, whichever is more stringent.
   B.   Any pretreatment facilities necessary for compliance shall be provided, operated, and maintained at the user's expense. Detailed plans describing such facilities and operating procedures shall be submitted to the pretreatment coordinator for review, and shall be acceptable to the pretreatment coordinator before such facilities are constructed. The review of such plans and operating procedures shall in no way relieve the user for the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the village engineer under the provisions of this chapter.
   C.   All users are required to comply with IEPA permitting requirements. Users shall obtain all necessary construction-operating permits from the IEPA prior to the village connection and/or discharge permit(s) being issued. IEPA will make the determination of actual permitting requirements based on changes in the wastewater volume or characteristics generated at the user site. The village will track and parallel this IEPA permitting process. No sources of non-residential wastewater will be allowed to discharge to village POTW until all permitting requirements have been satisfied. Such pretreatment facilities shall be under the control and direction of an IEPA-certified wastewater operator.
   D.   Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the village and IEPA prior to the user's initiation of the changes. Users shall obtain all additional construction-operating permits from IEPA and the village for the changes prior to discharge. (Ord. 20-08-25, 8-10-2020)