Section
General Provisions
160.001 Findings of fact
160.002 Purpose
160.003 Applicability
160.004 Compatibility with other permit and ordinance requirements
160.005 Severability
160.006 Development of a stormwater design manual
160.007 Definitions
Permit Procedures and Requirements
160.020 Permit required
160.021 Application requirements
160.022 Application review fees
160.023 Application procedure
160.024 Permit duration
Waivers to Stormwater Management Requirements
160.040 Waivers for providing stormwater management
160.041 Fee in lieu of stormwater management practices
160.042 Dedication of land
General Performance Criteria for Stormwater Management
160.055 Criteria for stormwater management
Basic Stormwater Management Design Criteria
160.070 Minimum control requirements
160.071 Site design feasibility
160.072 Conveyance issues
160.073 Pretreatment requirements
160.074 Treatment/geometry conditions
160.075 Landscaping plans required
160.076 Maintenance agreements
160.077 Non-structural stormwater practices
Requirements for Stormwater Management Plan Approval
160.090 Stormwater management plan required for all developments
160.091 Stormwater management concept plan requirements
160.092 Final stormwater management plan requirements
160.093 Performance bond/security
Construction Inspection
160.110 Notice of construction commencement
160.111 As built plans
160.112 Landscaping and stabilization requirements
Maintenance and Repair of Stormwater Facilities
160.130 Mainteance easement
160.131 Maintenance covenants
160.132 Requirements for maintenance covenants
160.133 Inspection of stormwater facilities
160.134 Right-of-entry for inspection
160.135 Records of installation and maintenance activities
160.136 Failure to maintain practices
Enforcement
160.150 Violations
160.151 Notice of violation
160.152 Stop work orders
160.153 Restoration of lands
160.154 Holds on occupation permits
160.999 Penalty
Cross-reference: