§ 151.053 PERMIT FEES.
   (A)   No permit shall be issued by the City Inspector under this subchapter until after the fees set forth in the following schedule shall have been paid:
      (1)   For the purpose of assessing permit fees, all light, switch and receptacle openings are classed as outlets:
         (a)   For each outlet, lighting fixture, switch and receptacle: $0.40;
         (b)   1.   Motors, exhaust fans and other fans less than two horsepower, each: $3:
               a.   From two, but less than ten, horsepower, each: $4;
               b.   From ten, but less than 35, horsepower, each: $5;
               c.   From 35, but less than 100, horsepower, each: $9; and
               d.   One hundred or more horsepower, per 100 horsepower: $15.
            2.   Each additional horsepower over 100: $0.08; and
            3.   Motor control equipment is included in these fees.
         (c)   Elevator, passenger, each: $10;
         (d)   Elevator, freight, each: $10;
         (e)   Motion picture machine, each: $4;
         (f)   Sound picture equipment, each: $6;
         (g)   Electric range or heater, each: $3;
         (h)   Water heater, each: $3;
         (i)   X-ray machine, each: $6;
         (j)   Gas or vacuum tube sign:
            1.   First transformer, each sign: $3; and
            2.   Each additional transformer: $1.
         (k)   Floodlight, single receptacle, each: $1;
         (l)   Floodlight, multiple receptacle, each: $3; and
         (m)   Two-hundred-twenty-volt outlet: $1.
      (2)   Each permanently connected electrical appliance or piece of equipment of any nature not otherwise specified shall be charged for as follows:
         (a)   One KVA or less: $1;
         (b)   Next 9 KVA, per KVA: $0.80;
         (c)   Next 40 KVA, per KVA: $0.60;
         (d)   Next 50 KVA, per KVA: $0.40; and
         (e)   More than 100 KVA, per KVA: $0.04.
      (3)   (a)   Each service and meter loop, or repairs to a service or meter loop, shall be charged for as follows:
            1.   Up to and including 100 amps: $4;
            2.   More than 100 amps, but not more than 200 amps: $6; and
            3.   More than 200 amps: $10.
         (b)   No outlets are included in this fee.
      (4)   T. pole: $5; and
      (5)   A/C unit, per unit: $5.
   (B)   In addition to the fees set out in division (A) above, the fee for issuing each permit shall be $10.
   (C)   For reinspection, for any reason, the fee shall be $25 for first reinspection. Subsequent inspections will be $50, $100, $150, etc.
(1998 Code, § 22-164) (Ord. 15-42, passed 12-16-2015)