(a) Easements in General. Adequate easements along rear or side lot lines shall be provided for utilities and drainage where necessary. A ten (10) foot easement on each front lot line for utilities is required.
(b) Stormwater and Drainage Easements. A drainage easement shall be provided, where a Subdivision is traversed by a, new or improved ditch, storm sewers or detention and retention basins that were constructed as part of the development and post construction water quality practices. The easement width shall be a minimum of thirty (30) feet or as the County Engineer and Planning Commission may require. The easement width for the major (100-year) storm path shall be a minimum of thirty (30) feet wide. The easement width for the overland floodways shall be dependent upon the width of the channel plus any operational space deemed necessary by the County Engineer.
(c) Fire Pond Easements. Easements shall be provided as may be required for fire ponds and related appurtenances.
(d) Utility Lines. All utility lines shall be located underground.
(Res. 2008-026. Adopted 3-17-08; Ord. 2015-561. Adopted 1-25-16.)