1462.11 BACKFILLING.
   Backfilling and related work shall be so done, and the quality of the materials used shall be such as to prevent the movement of the earth of adjoining properties or the subsequent caving-in of backfilled areas. Backfilling shall not be done until retaining walls, foundation walls or other construction against which backfill is placed are in suitable condition to resist lateral pressure. No backfilling shall be done by methods which may cause dislodgment of any retaining wall or other permanent structure.  
(Ord. 1956-88. Passed 10-1-56.)