1226.05 FINAL SUBDIVISION PLAT.
   (EDITOR'S NOTE: This section was formerly codified as Section 1226.06 before being renumbered by Ordinance 2006-161.)
   Following the approval by the Planning Commission of a preliminary plat, and subject to the provisions of these Regulations, the owner, subdivider or agent shall prepare for record purposes and for dedication of public streets, utilities and other public places a final plat of the proposed subdivision.
   The final plat of a subdivision shall conform to the preliminary plat as approved, and if desired by the developer, may constitute only that portion of the approved preliminary plat which he proposes to record and develop at the time, provided such portion conforms to all the requirements of these Regulations.
   Application for approval of the final plat of a subdivision in writing and sixteen copies of the final plat, improvement plans, supplementary material and other exhibits required for approval as specified in Section 1230.03 of these Regulations shall be submitted to the Planning Commission at least fourteen days prior to the meeting at which it is to be considered.
   In addition to the foregoing requirements of the final plat for record, there shall be filed with the Engineer, profiles of the streets to be dedicated, showing existing surface elevations on the center line and the proposed finished grade of such streets and the existing surface elevations at the proposed right of way, side lines and at the building line, and the identification, location and description of U.S. mail receptacles to be installed for the deposit or receipt of mail.
(Ord. 2005-161. Passed 11-21-05.)