SECTION 405E – INSPECTION REPORTS.
   The qualified professional performing any inspection required by this Chapter 4E shall prepare an inspection report in conformity with Section 404E and the Administrative Bulletin adopted by the Department. The property owner or property owner’s authorized agent shall submit a copy of the inspection report to both the property owner and the Department within the time required by Table 403E, provided, however, that the qualified professional shall report any unsafe conditions to the Department immediately notwithstanding the deadline in Table 403E.
   Within 60 days of receipt of an inspection report, the Department shall confirm receipt of the report, provide review comments, if any, and confirm timelines and other requirements for maintenance actions and subsequent inspections.
SECTION 406E – FEES
   The Standard Hourly Rates set forth in Table 1A-D shall be charged to compensate the Department for inspection report review, evaluation, and processing related to implementation and enforcement of this Chapter 4E.
SECTION 407E
   The Director shall implement the procedures detailed in San Francisco Building Code Section 102A, Unsafe Buildings, Structures or Property, and related abatement actions when any of the requirements for façade inspection, reporting, mitigation, repair, or maintenance are not met in a timely manner.
(Added by Ord. 65-19, File No. 190136, App. 4/12/2019, Eff. 5/13/2019)