You are viewing an archived code
Loading...
Permit to install or replace | |
Permit to operate (certificate issued) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Renew permit to operate (certificate issued) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Replacement of issued permit to operate | Standard Administration Hourly Rate - Minimum One- Half Hour |
Connection to utility company provided steam (includes permit to operate) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Boiler Maintenance Program | $48.36 |
Renewal required:
2. Water heaters when alteration or replacement permits are issued.
INITIAL INSPECTION | COMPLIANCE INSPECTION | |
Single-family dwellings and two-family dwellings | $158.10 | $79.05 |
Apartment houses and residential hotels:
| ||
Up to 20 rooms | $237.15 | $118.58 |
Each additional 10 rooms or portion thereof | $79.05 | $48.36 |
Energy reports and certificates: | $48.36 | |
Filing fee for appeals: | $96.72 | |
Certification of qualified energy inspector: | $186.00 | |
1. One- and Two-family dwelling unit fees: | $52.00 per rental unit |
2. Apartment house license fees: | |
Apartment houses of 3 to 12 units | $326.00 per annum |
Apartment houses of 13 to 30 units | $488.00 per annum |
Apartment houses of more than 30 units | $488.00 and $55.00 for each additional 10 units or portion thereof |
3. Hotel license fees: | |
Hotels of 6 to 29 rooms | $256.00 per annum |
Hotels of 30 to 59 rooms | $470.00 per annum |
Hotels of 60 to 149 rooms | $584.00 per annum |
Hotels of 150 to 200 rooms | $660.00 per annum |
Hotels of more than 200 rooms | $660.00 and $55.00 for each additional 25 rooms or portion thereof |
Annual unit usage report | $96.72 |
1. Appeal of initial or annual status determination: | Standard Inspection Hourly Rate pursuant to Section 110A
of this code shall apply for Department Inspector’s work on such request plus fees for Hearing Officer |
2. Challenge to claims of exemption: | |
Usage report | $48.36 |
Claim of exemption based on low-income housing | $316.20 |
Claim of exemption based on partially completed conversion | $474.30 |
3. Complaint of unlawful conversion | $48.36 |
Determination by Department of Real Estate and cost of independent appraisals | Actual costs |
4. Initial unit usage report | $316.20 |
5. Permit to convert | $474.30 |
6. Request for hearing to exceed 25% tourist season rental limit: | |
Inspection staff review - standard hourly inspection fee | Standard Inspection Hourly Rate |
Statement of exemption - Hearing Officer fee | $316.20 |
7. Unsuccessful challenge: | |
Usage report: | |
Inspection staff review - standard hourly inspection fee | Standard Inspection Hourly Rate |
Statement of exemption - Hearing Officer fee | $316.20 |
Request for winter rental: | |
Standard hourly inspection fee | Standard Inspection Hourly Rate |
Partial or complete refunds of only those fees contained herein will be given, provided the applicant meets the refund requirements of the applicable section of this code. No other fees are refundable, except as follows:
1. Application or Permit Issuance Fee: | |
Building, plumbing, electrical or mechanical permit issuance fee | Amount paid less $160.00 or actual costs, whichever is greater. No refunds given after work started. |
Plan Review Fees (each) | Amount determined by the Building Official less $160.00 No Refund due after application deemed acceptable for Department of Building Inspection Plan Review |
2. Miscellaneous Fees: | Amount paid less $52.00 No refunds less than $52.00 |
No existing permittee who paid a fee under the fee schedules in effect at the time the fee was paid shall be eligible for a refund or subject to a fee reassessment as a result of an amendment to the fee schedules. If the Building Official determines that an error has been made in the assessment of fees, a refund for the portion determined to be in error may be made upon written request by the applicant.
Review of Inventory Form (Section 1604B.2.1) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Review of the summary of the engineering report (Section 1604B.2.3) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for a variance from or interpretation of code requirements | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for the approval of substitute materials or methods of design or construction (Section 105A.7.3) | Standard Plan Review Hourly Rate - Minimum Four Hours |
FIGURE 1A-I –1851 HIGH-TIDE LINE MAP

