You are viewing an archived code
Loading...
NEW CONSTRUCTION 1, 3
| ALTERATIONS 1, 2, 3
| NO PLANS 1, 2, 3 | |||
TOTAL VALUATION | PLAN REVIEW FEE | PERMIT ISSUANCE FEE | PLAN REVIEW FEE | PERMIT ISSUANCE FEE | PERMIT ISSUANCE FEE |
NEW CONSTRUCTION 1, 3
| ALTERATIONS 1, 2, 3
| NO PLANS 1, 2, 3 | |||
TOTAL VALUATION | PLAN REVIEW FEE | PERMIT ISSUANCE FEE | PLAN REVIEW FEE | PERMIT ISSUANCE FEE | PERMIT ISSUANCE FEE |
$1.00 to $2,000.00 | $131.29 for the first $500.00 plus $5.42 for each additional $100.00 or fraction thereof, to and including $2,000.00 | $56.27 for the first $500.00 plus $2.33 for each additional $100.00 or fraction thereof, to and including $2,000.00 | $144.85 for the first $500.00 plus $2.93 for each additional $100.00 or fraction thereof, to and including $2,000.00 | $62.08 for the first $500.00 plus $1.26 for each additional $100.00 or fraction thereof, to and including $2,000.00 | $167.40 for the first $500.00 plus $3.72 for each additional $100.00 or fraction thereof, to and including $2,000.00 |
$2,001.00 to $50,000.00 | $212.59 for the first $2,000.00 plus $13.02 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | $91.22 for the first $2,000.00 plus $5.58 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | $188.80 for the first $2,000.00 plus $17.77 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | $80.98 for the first $2,000.00 plus $7.62 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | $223.20 for the first $2,000.00 plus $5.42 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 |
$50,001.00 to $200,000.00 | $837.55 for the first $50,000.00 plus $8.68 for each additional $1000.00 or fraction thereof, to and including $200,000.00 | $359.06 for the first $50,000.00 plus $3.72 for each additional $1000.00 or fraction thereof, to and including $200,000.00 | $1,041.76 for the first $50,000.00 plus $10.63 for each additional $1000.00 or fraction thereof, to and including $200,000.00 | $446.74 for the first $50,000.00 plus $4.56 for each additional $1000.00 or fraction thereof, to and including $200,000.00 | $483.36 for the first $50,000.00 plus $2.66 for each additional $1000.00 or fraction thereof, to and including $200,000.00 |
$200,001.00 to $500,000.00 | $2,139.55 for the first $200,000.00 plus $6.07 for each additional $1000.00 or fraction thereof, to and including $500,000.00 | $917.06 for the first $200,000.00 plus $2.60 for each additional $1000.00 or fraction thereof, to and including $500,000.00 | $2,636.26 for the first $200,000.00 plus $8.68 for each additional $1000.00 or fraction thereof, to and including $500,000.00 | $1,130.74 for the first $200,000.00 plus $3.72 for each additional $1000.00 or fraction thereof, to and including $500,000.00 | Plans Required for Submittal |
$500,001.00 to $1,000,000.00 (1M) | $3,960.55 for the first $500,000.00 plus $5.42 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $1,697.06 for the first $500,000.00 plus $2.33 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $5,240.26 for the first $500,000.00 plus $5.97 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $2,246.74 for the first $500,000.00 plus $2.56 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | Plans Required for Submittal |
$1,000,001.00 to $5,000,000.00 (5M) | $6,670.55 for the first $1,000,000.00 plus $4.77 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $2,862.06 for the first $1,000,000.00 plus $2.05 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $8,225.26 for the first $1,000,000.00 plus $5.42 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | $3,526.74 for the first $1,000,000.00 plus $2.33 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 | Plans Required for Submittal |
$5,000,001.00 (5M) to $50 M | $25,751.00 for the first $5,000,000.00 plus $1.86 for each additional $1,000.00 or fraction thereof | $11,062.00 for the first $5,000,000.00 plus $1.04 for each additional $1,000.00 or fraction thereof | $29,905.00 for the first $5,000,000.00 plus $1.67 for each additional $1,000.00 or fraction thereof | $12,847.00 for the first $5,000,000.00 plus $0.94 for each additional $1,000.00 or fraction thereof | Plans Required for Submittal |
$50M to $100M | $109,451.00 for the first $50,000,000.00 plus $1.88 for each additional $1,000.00 or fraction thereof | $57,862.00 for the first $50,000,000.00 plus $1.34 for each additional $1,000.00 or fraction thereof | $105,055.00 for the first $50,000,000.00 plus $2.05 for each additional $1,000.00 or fraction thereof | $55,147.00 for the first $50,000,000.00 plus $1.47 for each additional $1,000.00 or fraction thereof | Plans Required for Submittal |
$100M to $200M | $203,451.00 for the first $100,000,000.00 plus $0.84 for each additional $1,000.00 or fraction thereof | $124,862.00 for the first $100,000,000.00 plus $0.92 for each additional $1,000.00 or fraction thereof | $207,555.00 for the first $100,000,000.00 plus $0.75 for each additional $1,000.00 or fraction thereof | $128,647.00 for the first $100,000,000.00 plus $0.84 for each additional $1,000.00 or fraction thereof | Plans Required for Submittal |
$200M and up | $287,451.00 for the first $200,000,000.00 plus $1.54 for each additional $1,000.00 or fraction thereof | $216,862.00 for the first $200,000,000.00 plus $1.89 for each additional $1,000.00 or fraction thereof | $282,555.00 for the first $200,000,000.00 plus $1.59 for each additional $1,000.00 or fraction thereof | $212,647.00 for the first $200,000,000.00 plus $1.93 for each additional $1,000.00 or fraction thereof | Plans Required for Submittal |
NOTES:
1. These permit fees do not include other fees that may be required by other Departments: Public Works, Planning, Fire, Public Health, etc., nor do they include plumbing, electrical or mechanical permit fees unless so stated in the other fee tables. 2. A surcharge of $5.00 shall be added to those alteration permits sought for buildings classified as R3 (one/two-family dwelling) and E3 (licensed day care) that were constructed prior to 1979 to implement the interior lead safe work practices provisions of Section et seq. of this code. 3. All permit fees related to reviewing the structural integrity of awning replacements for permits submitted "over the counter" at the Central Permit Bureau are hereby waived for any permit issued to a Small Business Enterprise for such activities during the month of May. For purposes of this Section, a Small Business Enterprise shall be a business that has 100 or fewer employees. The Planning Department and the Department of Building Inspection shall establish process by which those two departments will certify that an applicant is a Small Business Enterprise for the purpose of this Section and Section of the Planning Code.
| |||||
Notwithstanding any provision of the Building Code, including the fee schedules of Tables 1A-A and 1A-E, the Plan Review Fee related to reviewing permit applications, or a portion of a permit application, seeking to legalize existing dwelling units that were constructed without the required permits is hereby waived for any permit issued for such activities prior to January 1, 2020; provided that other fees, including but not limited to fees for applications to undertake structural work or excavation [activities] or any fees required by State law, shall not be waived.
See Section 2(b) of Ord. 146-15, File No. 150571, App. 8/6/2015, Eff. 9/5/2015.
Plan Review Hourly Rate - Minimum One Hour | |
2. Back Check Fee: | Plan Review Hourly Rate - Minimum One Hour |
3. Commencement of work not started: | |
a. Building, Plumbing, Mechanical, or Electric Permit Fee: | 75% of current fee |
b. Plan Review Fee: | 100% of current fee |
4. Permit Facilitator Fee: | |
5. Pre-application Plan Review Fee: | Plan Review Hourly Rate - Minimum Two Hours Per Employee |
6. Reduced Plan Review Fee: | 50% of the Plan Review Fee |
7. Sign Plan Review Fee: | |
8. Site Permit Fee: | |
9. Premium Plan Review Fee– Submitted application: | 50% of Plan Review Fee plus $1,000.00 |
10. Premium Plan Review Fee– Over the counter building plan review by appointment: | 50% of Plan Review Fee plus $400.00 |
11. Third-Party Experts and Other Permit Related Actions Fee:
|
Actual costs that the Department incurs in administering and processing the action or procedure on a time and materials basis.
|
12. Other Services: | Hourly Rates per Table 1A-D |
NOTES:
2. “Back check” is defined as: (1) that time spent reviewing applicant-initiated revisions to plans that do not affect the valuation, scope or size of the project; or (2) any additional plan review performed on required corrections to plans beyond the standard review process, as determined by the Building Official. Plan review required for applicant-initiated revisions effecting valuation, scope, or size or project may be assessed a new plan review fee in addition to the initial plan review fee as determined by the Building Official.
(Amended by Ord. 36-18, File No. 170942, App. 3/9/2018, Eff. 4/9/2018)
A. Permit applicants shall show a complete itemization of the proposed scope of work and select the appropriate fee category.
B. A separate permit is required for each structure, condominium unit, existing apartment unit, high- rise office floor, suite, or tenant space.
C. Standard hourly issuance/inspection rates will apply for installations not covered by the fee categories below.
D. Fees shall be paid in full prior to approval for occupancy, job card signature, gas tags, or final signoff, as applicable.
E. See Table 1A-R for refund policy.
1. Permit Issuance Fees by Category:
CATEGORY 1P | Single Residential Unit– water service, sewer replacement, single plumbing fixture installation, shower pan installation, or kitchen or bathroom remodels | $148.80 |
CATEGORY 1M | Single Residential Unit– mechanical gas appliance (furnace, hydronic heat, heat pump) | $139.50 |
CATEGORY 2PA | Plumbing installation for residential construction with 6 or less dwelling units or guest rooms; without underground plumbing installation (includes water, gas, waste, and vent) | $255.75 |
CATEGORY 2PB | Plumbing installation for residential construction with 6 dwelling units or guest rooms or less; with underground plumbing installation (includes water, gas, waste, and vent) | $372.00 |
CATEGORY 2M | Mechanical gas appliances for residential construction with 6 dwelling units or guest rooms or less | $223.20 |
CATEGORY 3PA | 7– 12 Dwelling Units | $534.75 |
CATEGORY 3PB | 13– 36 Dwelling Units | $1,069.50 |
CATEGORY 3PC | Over 36 Dwelling Units | $4,464.00 |
CATEGORY 3MA | 7– 12 Dwelling Units | $534.75 |
CATEGORY 3MB | 13– 36 Dwelling Units | $1,069.50 |
CATEGORY 3MC | Over 36 Dwelling Units | $4,464.00 |
CATEGORY 4PA | Fire sprinklers– one and two family dwelling units | $139.50 |
CATEGORY 4PB | Fire sprinklers– 3 or more dwelling units or guest rooms, commercial and office– per floor | $232.50 |
CATEGORY 5P/5M | Office, mercantile & retail buildings: New or Tenant Improvements; heating/cooling equipment to piping connected thereto– per tenant or per floor, whichever is less | $302.25 |
CATEGORY 6PA | Restaurants (new and remodel) fee includes 5 or less drainage and or gas outlets– no fees required for public or private restroom | $289.23 |
CATEGORY 6PB | Restaurants (new and remodel) fee includes 6 or more drainage and/or gas outlets– no fees required for public or private restroom | $818.40 |
CATEGORY 8 | New boiler installations over 200 kbtu | $255.75 |
CATEGORY 9P/M | Surveys | $279.00 |
CATEGORY 10P/M | Condominium conversions | $339.45 |
BOILER MAINTENANCE PROGRAM | (Permit to operate– PTO) See Table 1A-M– Boiler Fees for additional boiler- related fees. | $48.36 each |
2. | Hourly inspection rate | |
A permit may include more than one category, and each category will be charged separately.
A. Permit applicants are required to itemize the proposed scope of work and select the appropriate category and fee amount.
B. Separate permits are required for each structure, condominium unit, existing dwelling unit (except in R3 occupancies), common area, commercial office floor or individual tenant space.
C. Standard hourly permit issuance and inspection rates shall apply for installations not covered by this fee schedule.
D. Fees shall be paid in full prior to obtaining: occupancy approval, job card signature, permission to energize, or final signoff, as applicable.
E. For the purpose of fee calculation: appliances and utilization equipment each count as one outlet or device in addition to receptacles, switches, and light outlets.
F. All permit fees related to reviewing the installation of pedestrian level lighting are hereby waived for any permit issued for such activities for Small Business Enterprises during the month of May. For purposes of this Section, a Small Business Enterprise shall be a business that has 100 or fewer employees. The Planning Department and the Department of Building Inspection shall establish process by which those two departments will certify that an applicant is a Small Business Enterprise for the purpose of this Section and Section of the Planning Code.
See Table 1A-R for refund policy.
See Table 1A-J for permit extensions.
Category 1
General Wiring: Residential Buildings up to 10,000 sq. ft.
General Wiring: Residential Buildings up to 10,000 sq. ft.
Up to 10 outlets and/or devices $148.80
11 to 20 outlets and/or devices $223.20
Up to 40 outlets and/or devices, includes up to 200 Amp service upgrade $279.00
* More than 40 outlets and/or devices $390.60
* Buildings of 5,000 to 10,000 sq. ft. $558.00
Category 2
General Wiring: Nonresidential Buildings & Residential Buildings over 10,000 sq. ft.
General Wiring: Nonresidential Buildings & Residential Buildings over 10,000 sq. ft.
Up to 5 outlets and/or devices $223.20
6 to 20 outlets and/or devices $334.80
* Areas up to 2,500 sq. ft. $446.40
* 2,501 to 5,000 sq. ft. $669.60
* 5,001 to 10,000 sq. ft. $1,116.00
* 10,001 to 30,000 sq. ft. $2,232.00
* 30,001 to 50,000 sq. ft. $4,464.00
* 50.001 to 100,000 sq. ft. $6,696.00
* 100,001 to 500,000 sq. ft. $13,392.00
* 500,001 to 1,000,000 sq. ft. $30,132.00
* More than 1,000,000 sq. ft. $60,264.00
* Includes Category 3 & 4 installations in new buildings or major remodel work
Category 3
Service Distribution and Utilization Equipment
Includes: Generators, UPS, Transformers and Fire Pumps
(Use Category 3 for installations separate from the scope of work in Categories 1 or 2)
Service Distribution and Utilization Equipment
Includes: Generators, UPS, Transformers and Fire Pumps
(Use Category 3 for installations separate from the scope of work in Categories 1 or 2)
225 amps rating or less $223.20
250 to 500 amps $334.80
600 to 1000 amps $446.40
1,200 to 2,000 amps $669.60
More than 2,000 amps $892.80
600 volts or more $892.80
150 kva or less $223.20
151 kva or more $334.80
Fire Pump installations $446.40
Category 4
Installations of Fire Warning and Controlled Devices
(Use Category 4 for installations separate from the scope of work in Categories 1 or 2)
Installations of Fire Warning and Controlled Devices
(Use Category 4 for installations separate from the scope of work in Categories 1 or 2)
Up to 2,500 sq. ft. $223.20
2,501 to 5,000 sq. ft. $334.80
5,001 to 10,000 sq. ft. $669.60
10,001 to 30,000 sq. ft. $1,116.00
30,001 to 50,000 sq. ft. $2,232.00
50,001 to 100,000 sq. ft. $4,464.00
100,001 to 500,000 sq. ft. $6,696.00
500,001 to 1,000,000 sq. ft. $15,066.00
More than 1,000,000 sq. ft. $30,132.00
Fire Warning and Controlled Devices (Retrofit Systems)
Buildings of not more than 6 dwelling units $334.80
Buildings of not more than 12 dwelling units $446.40
Buildings with more than 12 dwelling units and non-residential occupancy
Building up to 3 floors $669.60
4-9 floors $1,339.20
10-20 floors $2,232.00
21-30 floors $4,464.00
More than 30 floors $6,696.00
Category 5
Miscellaneous Installations
Miscellaneous Installations
Installation of EV Charging Station Same fee as is applicable for Category 3 –
Service Distribution and Utilization
Equipment.
Service Distribution and Utilization
Equipment.
Remodel/Upgrade of Existing Hotel Guest/SRO Rooms
Up to 6 rooms $279.00
Each additional group of 3 rooms $139.50
Data, Communications, and Wireless Systems
10 cables or less Exempt
11 to 500 cables $158.10
Each additional group of 100 cables $23.25
Security Systems, 10 components or less $158.10
Each additional group of 10 components $9.30
Includes installations and devices that interface with life safety systems; excludes installations in R3 Occupancies
Office Workstations, 5 or less $158.10
Each additional group of 10 workstations $46.50
Temporary Exhibition Wiring, 1 to 100 booths (1 inspection) $223.20
Each additional group of 10 booths $23.25
Exterior Electrical Sign $158.10
Interior Electrical Sign $158.10
Each Additional Sign, at the same address $37.20
Garage Door Operator (Requiring receptacle installation) $158.10
Quarterly Permits $348.75
Maximum five outlets in any one location
Survey, per hour or fraction thereof $158.10
Survey, Research, and Report preparation, per hour or fraction thereof $279.00
Witness Testing: life safety, fire warning, emergency, and energy management systems
Hourly Rate $158.10
Additional hourly rate $158.10
Off-hour inspections: (two hour minimum) $316.20
Additional off-hourly rate $237.15
Energy Management, HVAC Controls, and Low-Voltage Wiring Systems
1-10 floors (3 inspections) $446.40
Each additional floor $46.50
Solar Photovoltaic Systems
10 KW rating or less $158.10
Each additional 10 KW rating $93.00
Standard Hourly Inspection Rate See Table 1A-D
(Amended by Ord. 3-19, File No. 180090, App. 1/25/2019, Eff. 2/25/2019)
Notwithstanding any provision of the Building Code, including the fee schedules of Tables 1A-A and 1A-E, the Plan Review Fee related to reviewing permit applications, or a portion of a permit application, seeking to legalize existing dwelling units that were constructed without the required permits is hereby waived for any permit issued for such activities prior to January 1, 2020; provided that other fees, including but not limited to fees for applications to undertake structural work or excavation [activities] or any fees required by State law, shall not be waived.
See Section 2(b) of Ord. 146-15, File No. 150571, App. 8/6/2015, Eff. 9/5/2015.
1. Bleachers Permit Fee: | |
2. Chimney and Flue Permit Fee: | |
3. Demolition Permit Fee: | |
4. Extra Permit Work: (exceeding scope) | 2 times the standard fees for work remaining to be done or not covered in original permit scope |
5. Garage Door Permit Fee: Each garage door in an existing building | $148.80 |
6. Grading Permit Fee: | |
7. House Moving Permit Fee: | Standard Hourly Inspection Rate - Minimum 3 Hours |
8. Recommencement of Work Not Completed: | |
9. Reroofing Permit Fee: | $148.80 for Single-Family homes and duplexes $223.20 for all others |
10. Strong Motion Instrumentation Program Fee: | |
Group R Occupancies of 3 stories or less, except hotels and motels | 0.00013 times the valuation |
Hotels and motels, all buildings greater than 3 stories, all occupancies other than Group R | 0.00024 times the valuation |
Minimum fee | $1.60 |
11. Subsidewalk Construction Permit Fee: | |
Construction | |
12. Construction of impervious surface in the required front and setback area | $148.80 |
1. Standard Hourly Rate | See Table 1A-D |
2. Off-hours inspection | Standard Hourly Inspection Rate - Minimum Two Hours plus permit fee |
3. Pre-application inspection | Standard Hourly Inspection Rate - Minimum Two Hours |
4. Re-inspection fee | Standard Hourly Inspection Rate |
5. Report of residential records (3R) | $148.80 |
6. Survey of nonresidential buildings: | Standard Hourly Inspection Rate - Minimum Two Hours |
7. Survey of residential buildings for any purpose or Condo Conversions: | |
Single unit | $1,627.50 |
Two to four units | $2,139.00 |
Five + units | $2,139.00 plus Standard Hourly Inspection Rate |
Hotels: | |
Includes 10 guestrooms | $1,627.50 |
11 + guestrooms | $2,139.00 plus $39.53 per guestroom over 11 |
8. Temporary Certificate of Occupancy | Standard Hourly Inspection Rate - Minimum Two Hours |
Loading...