You are viewing an archived code
Loading...
1. Abatement Appeals Board hearing, filing fee | $158.10 per case |
2. Board of Examiners filing fees: | |
Each appeal for variance from interpretation of code requirements | Standard Hourly Plan Review Rate - Minimum Two Hours |
Each appeal for approval of substitute materials or methods of construction | Standard Hourly Plan Review Rate - Minimum Four Hours |
3. Building Official’s abatement order hearing | Standard Hourly Plan Review Rate - Minimum Two Hours |
4. Emergency order | Standard Hourly Plan Review Rate - Minimum Two Hours |
5. Exceeding the scope of the approved permit | 2 times the issuance fee |
6. Access Appeals Commission: | |
Filing fee | Standard Hourly Plan Review Rate - Minimum Two Hours per appeal |
Request for a rehearing | Standard Hourly Plan Review Rate - Minimum Two Hours |
7. Lien recordation charges | $173.91 or 10 percent of the amount of the unpaid balance, including interest, whichever is greater |
8. Work without permit: investigation fee: | |
9 times the Permit Issuance Fee plus the original permit fee | |
9. Building Inspection Commission hearing fees: | |
Notice of appeal | Standard Hourly Plan Review Rate - Minimum Four Hours |
Request for jurisdiction | Standard Hourly Plan Review Rate - Minimum Four Hours |
Request for rehearing | Standard Hourly Plan Review Rate - Minimum Two Hours |
10. Additional hearings required by Code | Standard Hourly Plan Review Rate - Minimum Four Hours |
11. Violation monitoring fee (in-house) | Standard Administration Hourly Rate– Minimum One- Half Hour Monthly |
12. Failure to register vacant commercial storefront
|
4 times the registration fee
|
(Amended by Ord. 52-19, File No. 181213, App. 3/22/2019, Eff. 4/22/2019)
1. Public notification and record keeping fees: | |
Structural addition notice | Standard Administration Hourly Rate - Minimum One- Half Hour |
Affidavit record maintenance | $15.00 |
Posting of notices (change of use) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Requesting notice of permit issuance (each address) per year | Standard Administration Hourly Rate - Minimum One- Half Hour |
30-inch by 30-inch (762 mm by 762 mm) sign | $15.00 |
2. Demolition: | |
Notice of application and permit issuance by area/interested parties: | |
1 area (1 area = 2 blocks) | $96.72 per annum per each area |
3. Notices: | |
300-foot (91.44 m) notification letters | Standard Administration Hourly Rate - Minimum One and One-Half Hour |
Residential tenants notification | Standard Administration Hourly Rate - Minimum One- Half Hour |
4. Reproduction and dissemination of public information: | |
Certification of copies: | |
1 to 10 pages | $15.00 |
Each additional 10 pages or fraction thereof | $3.50 |
Electrostatic reproduction: | |
Each page photocopy | $0.10 |
35 mm duplicards from microfilm rolls (Diazo card) | $3.50 |
Hard copy prints: | |
8 1/2 inch by 11 inch copy from microfilm roll | $0.10 |
11 inch by 17 inch copy of plans | $0.10 |
8 1/2 inch by 11 inch copy from aperture cards or from electronic copies of building records (scanned or computer generated) | $0.10 |
5. Replacement of approved construction documents: | |
Each sheet of plans (Larger than 11 × 17) | ACTUAL COST CHARGED BY VENDOR |
6. Records Retention Fee | |
Each page of plans per page of plans | $3.00 |
Each page of supporting documentation (e.g., soil reports, structural calculations, acoustical reports, energy calculations, etc.) per page of documentation | $0.10 |
Permit to install or replace | |
Permit to operate (certificate issued) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Renew permit to operate (certificate issued) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Replacement of issued permit to operate | Standard Administration Hourly Rate - Minimum One- Half Hour |
Connection to utility company provided steam (includes permit to operate) | Standard Administration Hourly Rate - Minimum One- Half Hour |
Boiler Maintenance Program | $48.36 |
Renewal required:
2. Water heaters when alteration or replacement permits are issued.
INITIAL INSPECTION | COMPLIANCE INSPECTION | |
Single-family dwellings and two-family dwellings | $158.10 | $79.05 |
Apartment houses and residential hotels:
| ||
Up to 20 rooms | $237.15 | $118.58 |
Each additional 10 rooms or portion thereof | $79.05 | $48.36 |
Energy reports and certificates: | $48.36 | |
Filing fee for appeals: | $96.72 | |
Certification of qualified energy inspector: | $186.00 | |
1. One- and Two-family dwelling unit fees: | $52.00 per rental unit |
2. Apartment house license fees: | |
Apartment houses of 3 to 12 units | $326.00 per annum |
Apartment houses of 13 to 30 units | $488.00 per annum |
Apartment houses of more than 30 units | $488.00 and $55.00 for each additional 10 units or portion thereof |
3. Hotel license fees: | |
Hotels of 6 to 29 rooms | $256.00 per annum |
Hotels of 30 to 59 rooms | $470.00 per annum |
Hotels of 60 to 149 rooms | $584.00 per annum |
Hotels of 150 to 200 rooms | $660.00 per annum |
Hotels of more than 200 rooms | $660.00 and $55.00 for each additional 25 rooms or portion thereof |
Annual unit usage report | $96.72 |
1. Appeal of initial or annual status determination: | Standard Inspection Hourly Rate pursuant to Section 110A
of this code shall apply for Department Inspector’s work on such request plus fees for Hearing Officer |
2. Challenge to claims of exemption: | |
Usage report | $48.36 |
Claim of exemption based on low-income housing | $316.20 |
Claim of exemption based on partially completed conversion | $474.30 |
3. Complaint of unlawful conversion | $48.36 |
Determination by Department of Real Estate and cost of independent appraisals | Actual costs |
4. Initial unit usage report | $316.20 |
5. Permit to convert | $474.30 |
6. Request for hearing to exceed 25% tourist season rental limit: | |
Inspection staff review - standard hourly inspection fee | Standard Inspection Hourly Rate |
Statement of exemption - Hearing Officer fee | $316.20 |
7. Unsuccessful challenge: | |
Usage report: | |
Inspection staff review - standard hourly inspection fee | Standard Inspection Hourly Rate |
Statement of exemption - Hearing Officer fee | $316.20 |
Request for winter rental: | |
Standard hourly inspection fee | Standard Inspection Hourly Rate |
Partial or complete refunds of only those fees contained herein will be given, provided the applicant meets the refund requirements of the applicable section of this code. No other fees are refundable, except as follows:
1. Application or Permit Issuance Fee: | |
Building, plumbing, electrical or mechanical permit issuance fee | Amount paid less $160.00 or actual costs, whichever is greater. No refunds given after work started. |
Plan Review Fees (each) | Amount determined by the Building Official less $160.00 No Refund due after application deemed acceptable for Department of Building Inspection Plan Review |
2. Miscellaneous Fees: | Amount paid less $52.00 No refunds less than $52.00 |
No existing permittee who paid a fee under the fee schedules in effect at the time the fee was paid shall be eligible for a refund or subject to a fee reassessment as a result of an amendment to the fee schedules. If the Building Official determines that an error has been made in the assessment of fees, a refund for the portion determined to be in error may be made upon written request by the applicant.
Review of Inventory Form (Section 1604B.2.1) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Review of the summary of the engineering report (Section 1604B.2.3) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for a variance from or interpretation of code requirements | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for the approval of substitute materials or methods of design or construction (Section 105A.7.3) | Standard Plan Review Hourly Rate - Minimum Four Hours |
Loading...