1159.04 PAVING.
   The required number of parking and loading spaces, as set forth in Sections 1159.03 and 1159.15, together with driveways, aisles, and other circulation areas, after approval. Construction shall be as follows:
   (a)   Topsoil shall be removed; curbs shall be constructed on both sides; base shall be excavated for not less than eleven (11) inches of number 304 stone, and compacted and paved with not less than two (2) inches of asphalt or six (6) inches of concrete. All paving shall be completed within one (1) year of approval.