1109.01 Preapplication meeting required.
1109.02 Preapplication sketch content.
1109.03 Preliminary plat required.
1109.04 Application for preliminary plat approval.
1109.05 Preliminary plat form.
1109.06 Plat contents.
1109.07 Supplementary information.
1109.08 Filing.
1109.09 Approval of preliminary plat.
1109.10 Construction and utility plan requirements.
1109.11 Approval period.
1109.12 Final plat required.
1109.13 Application for final plat approval.
1109.14 Guarantee for installation of improvements.
1109.15 Final plat form.
1109.16 Final plat contents.
1109.17 Supplementary information.
1109.18 Filing.
1109.19 Approval of final plat.
1109.20 Transmittal of original tracings and copies.
1109.21 Minor subdivisions (lot splits).
1109.22 Performance and maintenance bonds or other surety.
1109.23 Subdivider’s agreement.
CROSS REFERENCES
Plat and contents - see Ohio R.C. 711.01 et seq.
The subdivider shall meet with the Village Planning Commission or its designated representative prior to submitting the preliminary plat. The purpose of this meeting is to discuss early and informally the purpose and effect of these regulations and the criteria and standards contained therein; and to familiarize the developer with the comprehensive plan, the zoning regulations, and the drainage, sewerage and water systems for the Village.
The subdivider shall submit to the Village Planning Commission a sketch plan, legibly drawn at a suitable scale and containing the proposed name of the subdivision and its acreage, existing and proposed streets, lot lay-out and existing natural and man-made features such as soil types, vegetation, general topography, existing easements and service facilities.
An application, in writing, for the approval of the preliminary plat, together with a minimum of seven copies of the preliminary plat and the supplementary information specified in Sections 1109.05 to 1109.10, inclusive, shall be submitted to the Village Planning Commission's designated representative at least fourteen days and not more than thirty days prior to the meeting of the Commission at which action is requested. The preliminary plat shall be prepared by a professional surveyor and the supplementary information shall be prepared by a professional engineer.
Loading...