Skip to code content (skip section selection)
Compare to:
Pinole Overview
Pinole, CA Municipal Code
PINOLE, CA MUNICIPAL CODE
Title 1 GENERAL PROVISIONS
Title 2 ADMINISTRATION AND PERSONNEL
Title 3 REVENUE AND FINANCE
Title 4 (RESERVED)
Title 5 BUSINESS LICENSES AND REGULATIONS*
Title 6 ANIMALS
Title 7 (RESERVED)
Title 8 HEALTH AND SAFETY*
Title 9 PUBLIC PEACE, MORALS AND WELFARE*
Title 10 VEHICLES AND TRAFFIC
Title 11 (RESERVED)
Title 12 STREETS AND SIDEWALKS
Title 13 PUBLIC SERVICES
Title 14 (RESERVED)
Title 15 BUILDINGS AND CONSTRUCTION
Title 16 SUBDIVISIONS*
Title 17 ZONING CODE
CROSS-REFERENCE TABLE
ORDINANCE LIST AND DISPOSITION TABLE
Loading...
13.20.060 COMMON INTEREST DEVELOPMENTS - 10 YEAR INSPECTION REQUIREMENT.
   The homeowners' association of a common interest development in which several individually-owned units share common sewer laterals shall provide the city with inspection verification of all privately owned building sewer laterals within the common interest areas at least once every ten (10) years for compliance with the duties and obligations imposed by this chapter. If no homeowners' association exists, then the individual unit owners, both jointly and individually, shall be liable for the duties and obligations with respect to building sewer laterals as established by the Pinole Municipal Code.
(Ord. 2012-02 § 1 (part), 2012)
13.20.070 INSPECTION PROCEDURES AND CRITERIA.
   A.   Inspection procedures.
      1.   The inspection shall be conducted by a licensed contractor qualified to provide video inspections. The contractor must have both a city of Pinole business license and a State of California contractor's license. The Department of Public Works will maintain a list of contractors on file at City Hall.
      2.   All building sewer laterals shall be inspected by video.
      3.   The property owner shall submit a video recording of the building sewer lateral inspection to the Department of Public Works for review along with the designated Inspection fee. At the beginning of such video, the qualified contractor shall state the address of the property and take a photograph of the home that the property owner shall submit to the Department of Public Works with the video.
      4.   The property owner or an agent for the property owner shall notify the city of the time and date of the Inspection at least seven (7) calendar days prior to the inspection.
      5.   Prior to testing, the building sewer lateral shall be thoroughly cleaned.
      6.   An inspection shall be valid for a period of six (6) months from the date of the Inspection. If a property owner fails to obtain a certificate of compliance within six (6) months after obtaining an Inspection, the Department of Public Works may, in its discretion, require the property owner to obtain another inspection before issuing a certificate of compliance.
   B.   Inspection criteria. A property complies with the provisions of this section if the inspection verifies all of the following conditions as approved by the Director of Public Works:
      1.   The building sewer lateral is free of roots, grease deposits, and other solids which may impede or obstruct the transmission of sewage.
      2.   There are no improper or illegal connections to the building sewer lateral such as sump pumps, down spouts or area drainage facilities.
      3.   All joints in the building sewer lateral are tight and sound to prevent the exfiltration of sewage and the infiltration of groundwater, storm water and/or rain water.
      4.   The building sewer lateral is free of structural defects, cracks, breaks, or missing portions and the grade is reasonably uniform without major sags or offsets.
      5.   The building sewer lateral is equipped with at least one (1) clean-out located within five (5) feet of the building footprint and with a backflow prevention device as required by Section 13.20.030.
      6.   None of the other defective conditions referred to in Section 13.20.040 exist on the property.
(Ord. 2012-02 § 1 (part), 2012)
13.20.080 MITIGATION OF FAILED TEST OR INSPECTION.
   A.   Notice and repair. When the Director of Public Works determines, in his or her discretion, that a building sewer lateral is in a defective condition, the city shall provide a written notice of violation that meets the criteria in Section 13.20.140. The property owner shall cause all repairs necessary to bring the building sewer lateral into compliance. All costs of repair or replacement of the building sewer lateral shall be borne by the property owner.
   B.   Additional inspection. Upon completion of repairs to or replacement of the building sewer lateral, the property owner shall have another inspection conducted in order to verify that the repairs or replacement have been properly completed, pursuant to Section 13.20.070.
(Ord. 2012-02 § 1 (part), 2012)
13.20.090 REPAIR OF BUILDING SEWER LATERAL - EXTENSION OF TIME FOR PROBATE PROCEEDINGS.
   A.   Probate and testamentary proceedings. For properties sold or transferred in a probate or other testamentary proceeding, pursuant to the termination of a joint tenancy or similar proceeding, any repair or replacement of a building sewer lateral shall be completed within ninety (90) days after the probate sale or other transfer. If repair or replacement does not occur within ninety (90) days after probate sale or transfer, the requirement to comply with this chapter becomes an obligation of the new property owner. The Public Works Director may provide additional extensions of time in writing.
(Ord. 2012-02 § 1 (part), 2012)
13.20.100 RIGHT OF ENTRY.
   As a condition of receipt of city sewer services and use of the public sewer, the Public Works Director, or his or her designee, may enter, conduct an inspection, collect wastewater samples, and test any building sewer lateral, building, structure, or premise to secure compliance or prevent a violation of this chapter. Unless there is an emergency threatening the public health, safety or welfare, the Public Works Director shall provide at least three (3) business days' notice to the property owner and/or tenant of intent to enter upon property. The Public Works Director may also request that a property owner provide all written records of inspection, maintenance, repair and replacement at the time of inspection of the building sewer lateral or within ten (10) or more business days after receipt of the request.
(Ord. 2012-02 § 1 (part), 2012)
13.20.110 BUILDING SEWER LATERAL COMPLIANCE AND ISSUANCE OF CERTIFICATE OF COMPLIANCE.
   The city shall review the final submitted Inspection for compliance with this chapter. When all conditions are met to the satisfaction of the city, the building sewer lateral shall be certified as complying with the provisions of the Pinole Municipal Code. The city shall thereupon issue a certificate of compliance to the property owner, noting that the building sewer lateral serving the property is properly equipped, structurally sound and meets the requirements of the city. Once a certificate of compliance is issued, the building sewer lateral for which the certificate of compliance is issued shall not require testing for a period of ten (10) years from the date of issuance of the certificate of compliance unless the city has reason to believe the building sewer lateral is in a defective condition. The certificate of compliance shall not imply a warranty or guarantee of any kind.
(Ord. 2012-02 § 1 (part), 2012)
Loading...