SEC. 19-215. REMOVAL OF ITEMS.
   Unless otherwise authorized by the engineer, a permittee shall remove all equipment, materials and debris from the permitted work site within three days after acceptance of the work.
(`64 Code, Sec. 26-11) (Ord. No. 2444)