(A) All preliminary subdivision proposals, including proposals for manufactured home parks and subdivisions, greater than 50 lots or five acres, whichever is the lesser, shall identify the flood hazard area and the elevation of the base flood.
(B) All final subdivision plans will provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided as part of an application for a Letter of Map Revision based on Fill (LOMR-F) to the floodplain administrator.
(C) All subdivisions shall be designed to minimize flood damage.
(D) All subdivisions shall locate and construct public utilities and facilities such as sewer, gas, electrical and water systems to minimize flood damage.
(E) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards.
(`64 Code, Sec. 35-23) (Ord. No. 2426, 2640, 2989)