(A) All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from systems into flood waters.
(B) All final subdivision plans will provide the elevation of proposed structure(s) and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the floodplain administrator.
(C) On-site waste disposal systems shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(D) All subdivisions shall locate and construct public utilities and facilities such as sewer, gas, electrical, and water systems to minimize flood damage.
(E) All subdivision proposals shall provide adequate drainage to reduce exposure to flood hazards.
(`64 Code, Sec. 35-22) (Ord. No. 2426, 2640)