SEC. 16-498. VALIDATION OF PROPER OPERATION.
   Within 90 days of commencement of operations of a wireless communications facility, the operator of such facility shall provide to the program a report prepared by a qualified engineer, verifying that the operation of such facility is in compliance with the standards established by the American National Standards Institute and the Institute of Electrical and Electronic Engineers for safe human exposure to electromagnetic fields and radio frequency radiation.
(`64 Code, Sec. 34-243) (Ord. No. 2449)