§ 21-32  WHEN CONNECTIONS TO BE MADE.
   Within 30 days after a water main in any street is completed and ready for use, the owner of every abutting lot whereon water is supplied for any human use shall cause the lot to be connected with the water main.  Within 30 days after a sewer main in a city street is completed and ready for use, the owner of every abutting lot having improvements thereon shall cause all water closets, bathtubs, lavatories, sinks and drains, except stormwater drains, upon the lot to be connected with the sewer main.
(`86 Code, § 21-32)  (Ord. 87-12-1, passed 12-21-87)