Loading...
No selling of land before approval. No person owning land composing a subdivision, or his agent, shall transfer or sell or agree to sell any lot or parcel of land located within a subdivision by reference to, or by exhibition, or by any other use of a plat of such subdivision, before such plat has received final approval of the Planning Commission and recorded by the County Clerk. Any such instrument of transfer, sale, or contract shall be void and shall not be subject to be recorded. The description of lots or parcels by metes and bounds in any contract or instrument of transfer or other document used in the process of selling or transferring same shall not exempt the person attempting to transfer from penalties provided or deprive the purchaser of any right or remedies he may otherwise have.
(Ord. 682, passed 2-22-79) Penalty, see § 155.99
(A) If any subdivider, County Court Clerk, public official, or other person who does not comply with the zoning code, KRS Chapter 100, with this regulation, the conditions set forth by the Planning Commission, Board of Adjustments, or any court, or does not comply with the plans presented and approved, the Planning Commission may take the following action:
(1) Injunctions. The Planning commission may apply for a injunction against any type of subdivision construction by a subdivider or a landowner.
(2) Building permits. The Planning Commission may direct the Building Inspector not to issue building permits in the subdivision in question.
(3) Fines. The Planning Commission may take action to fine any person or entity who is in violation of these provisions or any of the regulations adopted pursuant hereunder for which no other penalty is provided. Upon conviction, the persons or entity shall be guilty of a misdemeanor and shall be fined not less than $10 but not more than $500 for each conviction. Each day of violation shall constitute a separate offense.
(B) Any person who is subject to the regulations of §§ 155.30 through 155.37 shall be liable to the city for a civil penalty of $250 per violation per day for as long as the violation Continues. In addition to such penalty, the city may recover from the person reasonable attorney fees, court costs and other expenses incurred in any enforcement proceedings.
(Ord. 682, passed 2-22-79; Am. Ord. 2001-1254, passed 8-23-01; Am. Ord. 2014-1635, passed 4-10-14)
FORM A
CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS
CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS
(to appear on preliminary and final plats)
I hereby certify that the water supply and
sewage disposal utility systems installed, or proposed for installation in the subdivision entitled:
fully meets the requirements of the Kentucky State Health Department, and hereby approved as shown.
sewage disposal utility systems installed, or proposed for installation in the subdivision entitled:
fully meets the requirements of the Kentucky State Health Department, and hereby approved as shown.
19
Date
Date
County Health Officer or other Approving Agent
(Blanks to be filled with the words "private" or "public".)
FORM B
(to appear on the preliminary and final plats)
CERTIFICATE OF AVAILABILITY OF WATER SERVICES
I hereby certify that, * shall supply the
Subdivision with water services and that the water distribution systems of said subdivision meets the requirements of this agency and all other requirements for the proper distribution of water.
Subdivision with water services and that the water distribution systems of said subdivision meets the requirements of this agency and all other requirements for the proper distribution of water.
,19
Engineer of the Appropriate Agency
Engineer of the Appropriate Agency
* (Name of company or agency distributing water)
FORM C
(to appear on the preliminary and final plats)
CERTIFICATE OF THE AVAILABILITY OF SEWAGE DISPOSAL SERVICES
I hereby certify that * shall supply the subdivision with sewage disposal services and
the sewage disposal system of said subdivision meets the requirements of this agency and all other requirements for the proper disposal of sewage.
the sewage disposal system of said subdivision meets the requirements of this agency and all other requirements for the proper disposal of sewage.
,19
Engineer of the Appropriate Agency
Engineer of the Appropriate Agency
*(Name of company or agency supplying sewage disposal services.)
FORM D
(to appear on final plat)
CERTIFICATE OF OWNERSHIP AND DEDICATION
I (we) hereby certify that I am (we are) the owner(s) of the property shown and described hereon and that I (we) hereby adopt this plan of subdivision with my (our) free consent, establish the minimum building restriction lines, and dedicate all streets, alleys, walks, parks and other open spaces to public or private use as shown in accordance with the Murray Subdivision Regulations, unless otherwise noted.
,19
Owner
Owner
FORM E
(to appear on final plat)
CERTIFICATE OF ACCURACY
I hereby certify that the plan shown and described hereon is a true and correct survey to' the accuracy required by the Murray, Kentucky Planning Commission and that the monuments have been placed as shown hereon to the specifications of the County Engineer or City Engineer.
,19
Registered Engineer or Surveyor
(Stamp)
FORM F
(to appear on the final plat)
(Use Form F-1 when improvements have been made before final approval)
(Use Form F-2 when security is to be posted)
F-1
CERTIFICATION OF THE APPROVAL OF STREETS AND UTILITIES
CERTIFICATION OF THE APPROVAL OF STREETS AND UTILITIES
I hereby certify that all streets, utilities, and other improvements have been installed in an acceptable manner and according to the city specifications
in subdivision.
in subdivision.
,19
Date
City Engineer or Approving Agent
F-2
CERTIFICATION OF THE APPROVAL OF STREETS AND UTILITIES
CERTIFICATION OF THE APPROVAL OF STREETS AND UTILITIES
I hereby certify that the proposed streets, construction plans for all streets, utilities and other improvements in
subdivision do meet the city speculations.
subdivision do meet the city speculations.
Furthermore, a * in the amount of $ has been posted with the Murray Legislative Body to assure the completion of all required improvements in case of default.
,19
Date
Date
City Engineer or Approving Agent
*(This blank to be filled in with the words, "cash". "certified check". or "security bond".)
FORM G
(to appear on final plat)
CERTIFICATE OF APPROVAL FOR RECORDING
I hereby certify that the subdivision plat shown hereon has been found to comply with the Subdivision Regulations for Murray, Kentucky, with the exception of such variances, if any, as are noted in the minutes of the Planning Commission, and that it has been approved for recording in the Office of the County Clerk.
,19
Chairman or Secretary of the Planning Commission
PRELIMINARY PLAT - CHECK LIST
(to be filed with minutes)
Name of subdivision
Location
Owner Tel.
Address
Surveyor or Engineer Tel.
Address
Date Submitted Fees $
Meeting Date
CHECK LIST
Fees Paid
Approval of County Health Officer received
Approval of Water Distribution System received
Approval of Sewerage System received
Three (3) copies received
Approved paper size (18"x24" or 24"x36")
Map (1" = 200' or greater)
SHOWN ON PLAT
Name and location of subdivision
Vicinity Map
Name and address of owners
Name and seal of engineer or surveyor
Acreage of land to be subdivided
Date
Graphic scale
North point
Certificates on plat
Adjacent property owners
Contours at 5' or lesser intervals
Boundary lines
Proposed and existing easements on and adjacent to tract and their dimensions
Present and proposed utilities on and adjacent to tract and proposed connections
Lot line and lot numbers Public sites
Setback lines
Protective covenants
Portion of larger tract and data shown
Approval given Refused
Grounds for refusal, if not shown above or conditions or modifications required
Variances granted (if any)
Subject to approval of Board of Adjustments
Approval received?
Date of action of Planning Commission
Chairman, Murray Planning Commission
FINAL PLAT - CHECK LIST
(to be filed with minutes)
(to be filed with minutes)
Name of subdivision
Location
Owners Tel. Address
Surveyor or Engineer Tel. Address
Date Submitted , Fee $
Location
Owners Tel. Address
Surveyor or Engineer Tel. Address
Date Submitted , Fee $
Date preliminary plat approved
Minor plat
Meeting Date
Minor plat
Meeting Date
CHECK LIST
Construction completed, security posted
Fees paid
Certificate of Ownership and Dedication
Certificate of Accuracy
Approval of County Health Department
Approval of Water Company
Approval of Sewerage System
Approval of City Engineer
The original plat and six (6) copies submitted
Approved paper size (18"x24" or 24"x36")
Maps (1" = 100' or larger)
Name of subdivision
Name and address of owner
Name of the engineer or surveyor and seal
Acreage of tract
Date
Graphic scale
True north point
Certificates on plat
Boundary lines and dimensions
All street rights-of-way and dimensions
All easements and dimensions
Lot lines and dimensions
Setback lines
Bearing, radii of angles
Name of street
Lot numbers and street numbers
Name of adjoining subdivisions and property owner
Protective covenants
Location of monuments
Profile sheets and street plans
(Contours on minor plats)
Fees paid
Certificate of Ownership and Dedication
Certificate of Accuracy
Approval of County Health Department
Approval of Water Company
Approval of Sewerage System
Approval of City Engineer
The original plat and six (6) copies submitted
Approved paper size (18"x24" or 24"x36")
Maps (1" = 100' or larger)
Name of subdivision
Name and address of owner
Name of the engineer or surveyor and seal
Acreage of tract
Date
Graphic scale
True north point
Certificates on plat
Boundary lines and dimensions
All street rights-of-way and dimensions
All easements and dimensions
Lot lines and dimensions
Setback lines
Bearing, radii of angles
Name of street
Lot numbers and street numbers
Name of adjoining subdivisions and property owner
Protective covenants
Location of monuments
Profile sheets and street plans
(Contours on minor plats)