15.402: DEVELOPMENT REQUIREMENTS:
Any development as defined in section 15.401 of this article will be required to provide the following:
   A.   All requirements listed under section 15.502, "Site Improvement Requirements", of this chapter.
   B.   Storm water detention for the entire site. Existing B5C zoning districts shall be exempt from this requirement, and shall only have to provide storm water detention for any increase in impervious surface, in accordance with subsection 15.502A of this chapter.
   C.   Curb and gutter around the perimeter of all parking lots and driveways.
   D.   Parking lot lighting.
   E.   Streetlights.
   F.   Site landscaping.
   G.   All construction shall comply with the construction specifications contained in chapter 16 of this code, and the tree protection standards contained in chapter 9 of this code. (Ord. 5253, 5-21-2002)