13.42.170: SEWER MAIN EXTENSION OR ALTERATION:
   A.   The inside diameter of every sewer main must not be less than eight inches (8") in diameter unless otherwise ordered by the Hawthorne town board or the director.
   B.   Sewer main pipelines may be extended or altered by a real estate developer, property owner, or other person in accordance with plans and specifications submitted to and approved by the Hawthorne town board and the utilities department at the expense of the party extending or altering the system.
   C.   The person extending or altering the sewer system shall offer to dedicate all sewer main pipelines located on property owned or controlled by the town of Hawthorne to the town of Hawthorne. Upon dedication and after the one year contractor warranty period has expired, the town shall operate and maintain the sewer main pipeline located on town property.
   D.   When, in the opinion of the Hawthorne town board or the director, it is necessary that a sewer main pipeline larger than eight inches (8") in diameter be constructed, the utilities department shall pay the difference in pipe material cost for the oversized sewer main pipeline. The subdivider, developer, property owner or other person, as the case may be, shall purchase the materials necessary to construct and install such oversized sewer main and shall further construct and install said sewer main. (TH Ord. 132A § 17, 1991)