911.02 GRADING.
All sidewalks hereafter constructed on any public street or highway shall be so laid that the top surface of the walk shall, at all points, coincide with the line described as follows: Beginning at the curb line with the established curb grade as determined by the City Engineer, thence extending to the property line, at right angles to the curb lines, with a rise of three-sixteenths of an inch to the foot; provided, that at street intersections where the grade of the intersecting street prevents compliance with the above provisions, the walk shall be laid under the direction and to the acceptance of the City Engineer. Before beginning the construction of any sidewalk, the owner, agent or contractor shall have the City Engineer or his assistants indicate the established grade by grade stakes. (Ord. 09-147. Passed 8-4-09.)