§ 163.01 INTENT.
   It is the intent of this chapter to include all fees which are required for building, community development, fire prevention and miscellaneous fees.
(Ord. 1417, passed 3-3-11)
§ 163.02 BUILDING FEES.
   (A)   Building permit fees.
TYPE
FEE
TYPE
FEE
Application fee
0.075% of the documented value of construction with a $5 minimum. The application fee is non-refundable.
Permit fee
0.75% of the documented value of construction with a $35 minimum
Plan review fee
0.45% of the documented value of construction
Inspection fee
0.45% of the documented value of construction
Surcharge fee: Department of Community Affairs (DCA)
As established by F.S. § 533.721 as may be amended from time to time
Surcharge fee: Building Code Administrators & Inspectors Fund (BCAIB)
As established by F.S. § 468.631 as may be amended from time to time
Manufactured (modular) buildings (includes: foundation, electrical, plumbing & mechanical)
0.75% of the documented value of construction with a $150 minimum
Mobile/manufactured home (includes: building, electrical, plumbing & mechanical)
0.75% of the documented value of construction with a $150 minimum
Building moving
$75
Demolition of structure
$75 (no fee if condemned by the city or used in Fire or Police Department training)
Transporting of solid waste
 
Businesses which transport certain solid waste as an integral part of their occupation may obtain a license to transport those wastes in lieu of utilizing the city’s solid waste franchise collector—payment is made at the time of payment of building permit (per § 91.44).
 
Reroofing
Demolition
Land clearing
$10
$50
$50
Minor repairs may be exempt from permit fee requirements, if, in the opinion of the Building Official, those repairs do not involve structural, electrical or roof modifications.
 
   (B)   Basis for determining construction value. The documented construction value shall be a contract signed by the appropriate parties or a detailed material and labor cost estimate. When these methods cannot be supplied, the valuation shall be determined by utilizing the current Building Valuation Table as published by the International Code Council.
   (C)   Electrical permit fees.
 
TYPE
FEE
New construction
$0.55 per amp, minimum fee $35 (each unit of multi- family housing is considered a separate housing unit for fee calculations)
Alterations, additions, repairs, changes of service, modular furniture
0.75% of the documented electrical valuation with a minimum charge of $35
Temporary service
$50
Prepower agreement
$90
 
   (D)   Plumbing permit fees.
 
TYPE
FEE
New construction
$35 plus $7 per fixture (each unit of multi-family housing is considered a separate housing unit for fee calculations)
Alterations, additions, repairs, irrigation
0.75% of the documented plumbing value with a minimum charge of $35
 
   (E)   Mechanical permit fees.
 
TYPE
FEE
New construction
   $0 - $1,000
   $1,000.01 - $2,500
   $2,500.01 - $5,000
   $5,000.01 - $10,000
   $10,000.01 - $25,000
   Greater than $25,000
$35
$50
$70
$90
$160
$7 per $1,000 of valuation, or fraction thereof
Additions, alterations, repairs
0.75% of the documented mechanical value with a minimum charge of $35
 
   (F)   Miscellaneous Building Department fees.
TYPE
FEE
TYPE
FEE
Early start authorization
$100
Re-inspection fee
$40
Resubmittal of plans as a result of plan review comments prior to permit issuance
First resubmittal (no charge)
Second and subsequent resubmittals
$2 per page for smaller than 11" x 17"
$25 per page from 11" x 17" to 30" x 42"
Resubmittal of plans and/or documents as a result of revisions after permit issuance
$2 per page for smaller than 11" x 17"
$25 per page for 11" x 17" to 30" x 42"
Restamp and recertification of unaltered plans after issuance of permit
$35 for single-family residential
$5 per page for commercial
Change of prime contractor
$25
Renewal, reissuance & extension of a permit
50% of the usual permit fees
Work commencing before permit issuance by owner
The usual permit fee plus 100% penalty; or $100 minimum
Work commencing before permit issuance by contractor
The usual permit fee plus 100% penalty; or $200 minimum
Proceeding with construction without required inspection
$100 per occurrence
Duplicate certificate of occupancy (C/O) or certificate of completion (C/C) at time of issuance
$10
After hours inspections
$50 per hours (4 hour minimum) per inspector availability
 
(Ord. 1417, passed 3-3-11)
§ 163.03 COMMUNITY DEVELOPMENT DEPARTMENT LAND DEVELOPMENT FEES.
   (A)   Comprehensive plan amendments and development of regional impact (DRIs).
 
TYPE
FEE
Comprehensive plan text amendment
$750
Development of regional impact (DRI)
$7,500
Large scale future land use (FLU) amendment
$1,500
Notice of proposed change (NOPC) to an approved DRI
$2,500
Small scale FLU amendment
$750
Cost of display ads and recording fees will be passed along to the applicant.
 
   (B)   Development plans.
TYPE
FEE
TYPE
FEE
Final plat
$600
Final subdivision
$600
Lot split
$250
Minor site plan
$600
Preliminary subdivision
$1,000
Site plan
$1,600
Site plan revision
$600
All development plans may also be subject to a fire review fee.
 
   (C)   Rezonings.
 
TYPE
FEE
Final Planned Unit Development (PUD)
$1,000**
Preliminary PUD
$500**
PUD amendment
$500*
Rezoning
$500*
Zoning text amendment (ZTA)
$250
* Cost of recording fees will be passed along to the applicant.
** May also be subject to a fire review fee.
 
   (D)   Right-of-way (ROW) utilization permit fees.
 
TYPE
FEE
Miscellaneous work by utility company within ROW
$100 for each 1,000 feet or fraction thereof
Each jack and bore operation by utility company within ROW
$100 each
Miscellaneous work within ROW
$250 if not part of site permit
Residential driveway connection to city street system and/or sidewalk
$50 if not part of building permit
Commercial driveway connection to city street system and/or sidewalk
$100 if not part of site permit
 
   (E)   Other Community Development Department land development fees.
TYPE
FEE
TYPE
FEE
Annexation
$500*
Arbor permit (residential)
$30
Arbor permit (commercial/site construction permit)
Minimum $50
Conditional use
$350**
Plan resubmittal (second & subsequent) based on Development Review Committee (DRC) comments
$150
Pruning permit
$30 (One- and two-family dwelling units are except per § 157.23)
Site construction permit
1.25% of contract price, minimum $250
Tree protection signs
$5
Vacate
$500*
Variance
$300**
Zoning verification letter
$50
* Cost of recording fees will be passed along to the applicant.
** May also be subject to a fire review fee.
 