(A) Building permit fees.
TYPE
| FEE
|
TYPE
| FEE
|
Application fee | 0.075% of the documented value of construction with a $5 minimum. The application fee is non-refundable. |
Permit fee | 0.75% of the documented value of construction with a $35 minimum |
Plan review fee | 0.45% of the documented value of construction |
Inspection fee | 0.45% of the documented value of construction |
Surcharge fee: Department of Community Affairs (DCA) | As established by F.S. § 533.721 as may be amended from time to time |
Surcharge fee: Building Code Administrators & Inspectors Fund (BCAIB) | As established by F.S. § 468.631 as may be amended from time to time |
Manufactured (modular) buildings (includes: foundation, electrical, plumbing & mechanical) | 0.75% of the documented value of construction with a $150 minimum |
Mobile/manufactured home (includes: building, electrical, plumbing & mechanical) | 0.75% of the documented value of construction with a $150 minimum |
Building moving | $75 |
Demolition of structure | $75 (no fee if condemned by the city or used in Fire or Police Department training) |
Transporting of solid waste | Businesses which transport certain solid waste as an integral part of their occupation may obtain a license to transport those wastes in lieu of utilizing the city’s solid waste franchise collector—payment is made at the time of payment of building permit (per § 91.44). |
Reroofing Demolition Land clearing | $10 $50 $50 |
Minor repairs may be exempt from permit fee requirements, if, in the opinion of the Building Official, those repairs do not involve structural, electrical or roof modifications. | |
(B) Basis for determining construction value. The documented construction value shall be a contract signed by the appropriate parties or a detailed material and labor cost estimate. When these methods cannot be supplied, the valuation shall be determined by utilizing the current Building Valuation Table as published by the International Code Council.
(C) Electrical permit fees.
TYPE
| FEE
|
New construction | $0.55 per amp, minimum fee $35 (each unit of multi- family housing is considered a separate housing unit for fee calculations) |
Alterations, additions, repairs, changes of service, modular furniture | 0.75% of the documented electrical valuation with a minimum charge of $35 |
Temporary service | $50 |
Prepower agreement | $90 |
(D) Plumbing permit fees.
TYPE
| FEE
|
New construction | $35 plus $7 per fixture (each unit of multi-family housing is considered a separate housing unit for fee calculations) |
Alterations, additions, repairs, irrigation | 0.75% of the documented plumbing value with a minimum charge of $35 |
(E) Mechanical permit fees.
TYPE
| FEE
|
New construction $0 - $1,000 $1,000.01 - $2,500 $2,500.01 - $5,000 $5,000.01 - $10,000 $10,000.01 - $25,000 Greater than $25,000 | $35 $50 $70 $90 $160 $7 per $1,000 of valuation, or fraction thereof |
Additions, alterations, repairs | 0.75% of the documented mechanical value with a minimum charge of $35 |
(F) Miscellaneous Building Department fees.
TYPE
| FEE
|
TYPE
| FEE
|
Early start authorization | $100 |
Re-inspection fee | $40 |
Resubmittal of plans as a result of plan review comments prior to permit issuance | First resubmittal (no charge) |
Second and subsequent resubmittals | $2 per page for smaller than 11" x 17" $25 per page from 11" x 17" to 30" x 42" |
Resubmittal of plans and/or documents as a result of revisions after permit issuance | $2 per page for smaller than 11" x 17" $25 per page for 11" x 17" to 30" x 42" |
Restamp and recertification of unaltered plans after issuance of permit | $35 for single-family residential $5 per page for commercial |
Change of prime contractor | $25 |
Renewal, reissuance & extension of a permit | 50% of the usual permit fees |
Work commencing before permit issuance by owner | The usual permit fee plus 100% penalty; or $100 minimum |
Work commencing before permit issuance by contractor | The usual permit fee plus 100% penalty; or $200 minimum |
Proceeding with construction without required inspection | $100 per occurrence |
Duplicate certificate of occupancy (C/O) or certificate of completion (C/C) at time of issuance | $10 |
After hours inspections | $50 per hours (4 hour minimum) per inspector availability |
(Ord. 1417, passed 3-3-11)