CHAPTER 1020
Streets
1020.01   Conditions for acceptance of streets and alleys.
1020.02   Notice of paving; utility connections.
1020.03   Adoption of State specifications; file copies.
 
1020.99   Penalty.
   CROSS REFERENCES
   Street construction and improvement by City employees - see 3rd Class 1918
   Sprinkling of streets - see 3rd Class 2403(49)
   Streets generally - see 3rd Class 2915 et seq.
   Street improvements - see 3rd Class 3301 et seq., 3310 et seq.
   Ordinances for vacating streets - see ADM. 212.01
   Obstructions and special uses of streets - see TRAF. Ch. 440
   Obstructing streets by railroads - see GEN. OFF. 662.03
   Excavations in streets - see S.U. & P.S. Ch. 1024
   Streets on Official Map - see P. & Z. 1226.01 et seq.
   Streets in subdivisions - see P. & Z. 1246.02
1020.01 CONDITIONS FOR ACCEPTANCE OF STREETS AND ALLEYS.
   No street or highway shall be accepted as a public street or highway of the City if it is less than fifty feet in width, and no alley shall be accepted or adopted as a public alley if it is less than sixteen feet in width. No alley shall hereafter be accepted which is a mere cross alley for the convenience of private property, unless the ordinance providing for the acceptance of the same is passed by the affirmative vote of at least six members of Council.
(Ord. 4391. Passed 9-10-86.)
1020.02 NOTICE OF PAVING; UTILITY CONNECTIONS.
   When any ordinance is passed authorizing the paving or repaving of any street or highway in the City, the City Engineer shall give at least thirty days notice before the commencement of the work. Such notice shall be served personally upon the person owning the pipes or premises affected. If personal service cannot be had, the notice shall be left upon the premises, which shall be equivalent to personal service upon all persons concerned. Such notice shall be given to each gas, water, steam heating or any other company to lay all such pipes as it may desire and to repair all pipes in the street or highway to be paved or repaved before the laying of the pavement is begun. All owners of property upon the line of the street or highway to be paved or repaved shall be required to make sewer, gas, steam, water and other connections before the laying of the pavement is begun. In default of making such sewer, gas, steam, water and other connections, within thirty days after notice, the Director of Public Works shall cause such sewer, gas, steam, water and other connections to be made, and the cost thereof shall be collected from such property owners as provided by law. All such connections shall be extended to the inner line of the curbstone of such street or highway.
(Ord. 881. Passed 10-12-20.)
1020.03 ADOPTION OF STATE SPECIFICATIONS; FILE COPIES.
   (a)   There is hereby adopted by the City, in its entirety, for the purpose of establishing construction and material specifications for streets and other public ways as set forth therein, that certain code known as Roadway Construction Standards, Publication No. 72 of the Pennsylvania Department of Transportation, the May, 1983, edition.
   (b)   Not less than three copies of such Code are on file with the City Clerk, and the City Clerk shall keep the same with the ordinance book of the City, and make the same available for public use, inspection and examination.
   (c)   No person shall violate or fail to comply with any of the provisions of the Code herein adopted by reference.
(Ord. 4391. Passed 9-10-86.)
1020.99 PENALTY.
   (EDITOR'S NOTE: See Section 202.99 for general Code penalty if no specific penalty is provided.)