CHAPTER 53: SEWAGE TREATMENT WORKS
Section
General Provisions
   53.01   Definitions
   53.02   Purpose
   53.03   Scope
   53.04   Administration
   53.05   Vandalism
   53.06   Severability
   53.07   Amendments
   53.08   Operating expenses of sewer system
   53.09   Wastewater Cash Reserved Fund
Use of Wastewater Facilities
   53.15   Waste disposal
   53.16   Wastewater discharges
   53.17   Wastewater disposal
   53.18   Connection to sewer required
   53.19   Grease, oil, and sand interceptors
   53.20   Control manhole
   53.21   Sewer line construction
Private Wastewater Disposal
   53.30   Exclusions
   53.31   Private system required
   53.32   Construction permit
   53.33   Design requirements
   53.34   Operating permit
   53.35   Connection to town system when available
   53.36   Sanitary operation required
   53.37   Further requirements
Building Sewers and Connections
   53.40   Connection permit
   53.41   Connection costs
   53.42   Separate connections required
   53.43   Existing building sewer
   53.44   Building sewer design
   53.45   Building sewer elevation
   53.46   Surface runoff and groundwater drains
   53.47   Conformance to applicable codes
   53.48   Connection inspection
   53.49   Excavation guards and property restoration
   53.50   Protection of capacity for existing users
Conditions of Use
   53.55   Special uses
   53.56   Restricted discharges
   53.57   Federal categorical pretreatment standards
   53.58   Special agreements
   53.59   Water and energy conservation
Class III Industrial Discharges
   53.65   Information requirements
   53.66   Provisions for monitoring
   53.67   Determination of wastewater characteristics
   53.68   Costs of damage
Pretreatment
   53.70   Wastewaters with special characteristics
   53.71   Compliance with pretreatment requirements
   53.72   Monitoring requirements
   53.73   Effect of federal law
   53.74   Revision of pretreatment standards
Wastewater Service Charges
   53.80   Payment
   53.81   Basis
   53.82   Determination of system use
   53.83   Specific fees and charges
   53.84   Industrial park sewer rates
Enforcement
   53.90   Inspections
   53.91   Right of entry
   53.92   Security clearance
   53.93   Governmental function
   53.94   Monetary liability
   53.95   Enforcement alternatives
   53.96   Administrative enforcement remedies
   53.97   Publication of significant violations
   53.98   Notice of violation
 
   53.99   Penalty