§ 53.44 BUILDING SEWER DESIGN.
   The size, slope, alignment, construction materials, trench excavation and backfill methods, pipe placement, jointing, and testing methods used in the construction and installation of a building sewer shall conform to the building and plumbing code or other applicable requirements of the town. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF shall apply.
(Ord. 5-1973, passed 1-7-1974; Am. Ord. 9-1990, passed 7-1-1991) Penalty, see § 53.99