1311.08 BUILDING PERMITS FOR APARTMENTS; PROCEDURE.
   The following procedure shall be followed to obtain building permits for apartments to be constructed in the City:
   (a)   The applicant shall make written request to the Planning Commission at least seven days prior to the Commission's meeting.
   (b)   The applicant shall present preliminary plans and layout showing the following information:
      (1)   Number and location of all units on plat;
      (2)   Number and location of parking spaces;
      (3)   Square feet for each unit;
      (4)   Approximate area of land involved;
      (5)   Means of ingress and egress;
      (6)   Available utilities, i.e., storm sewer, sanitary sewer, water, gas and electricity;
      (7)   Indication of present zoning classification ; and
      (8)   Location of parcel in relation to nearest dedicated streets.
         (Ord. 40-1964. Passed 5-25-64.)
    (c)   Upon approval of such preliminary plat by the Commission, the plat shall be presented to the City Architect and to the Ward Councilman.
   (d)   The final plat shall be prepared embodying all changes required by the Commission and the City Architect. (Ord. 58-1966. Passed 7-11-66.)
   (e)   Final plans shall be delivered to the City Engineer at least five days before the Commission meeting.
   (f)   Final plans shall be presented to the Commission. Such final plans shall include the following:
      (1)   Complete boundary and topographical survey;
      (2)   Complete plan and profile of all sewers, water lines, roads and drives;
      (3)   All drainage of building and parking areas;
      (4)   Location of all buildings, including those on adjoining lots and show elevations of all finished grades; and
      (5)   Show finished floor elevations on all proposed buildings and structures.
   (g)   The final plan shall be submitted to Council for approval and acceptance together with a resolution accepting the proper and necessary easements for sewer and/or water lines.
   (h)   Upon receipt of prints bearing the approval of the Cleveland Water Department, the applicant shall deposit the required funds with the City for legal, engineering and inspection costs.
   (i)   The building permit may then be issued.
      (Ord. 40-1964. Passed 5-25-64; Ord. 58-1966. Passed 7-11-66.)