927.12 MAP AND SPILL PREVENTION PLAN.
   At the time of application, the applicant shall provide a map, prepared by a registered surveyor, showing that exact location where the proposed well is to be drilled. The map shall also identify the location, type and size of proposed pipelines, either above or below ground, and any structures within 300 feet of the proposed well location. Additionally, the map shall indicate the location of all power shut-offs along with a detailed description of the operation of same, the location of all transmission lines, the location of oil flow shut-offs along with a detailed description of the operation of same and the location of any access roads. Any amendments to this map shall be immediately filed with the Building Commissioner. In the event a permit is granted, the map shall remain on file in the office of the Commissioner.
   At the time of application, the applicant shall provide a satisfactory spill prevention plan and a list of telephone numbers of the drillers' business and residence, and any other telephone numbers which can be used for emergency notification to the driller or his employees or agents.
(Ord. 79-1985. Passed 11-25-85.)