Section
General Provisions
156.01 Title
156.02 Purpose
156.03 Authority
156.04 Jurisdiction
156.05 Interpretation
156.06 Severability
156.07 Amendments
156.08 Waivers
Procedures for Subdivision Plat Approval
156.20 General
156.21 Classification of subdivisions
156.22 Review procedures
156.23 Submittal date
156.24 Planning Commission action
156.25 Pre-Application conference
156.26 Concept plan
156.27 Preliminary plat
156.28 Construction plans
156.29 Final plat
156.30 Miscellaneous platting situations
156.31 GIS submittal
Minimum Design Standards
156.40 General requirements
156.41 Subdivision and street names
156.42 Street design principles
156.43 Conformity of street design and alignment
156.44 Block design
156.45 Lots
156.46 Stormwater management facilities
156.47 Subsurface sewage disposal systems (septic tanks)
156.48 Areas subject to periodic flooding or inundation
156.49 Building setbacks, proximity to electric transmission lines
156.50 Access to lots
156.51 Water facilities and fire protection
156.52 Pedestrian ways
156.53 Street lighting
156.54 Aesthetics
Assurance for Completion and
Warranty of Improvements
Warranty of Improvements
156.70 Timing of improvement
156.71 Performance surety
156.72 Inspection of improvements
156.73 Warranty period and certificate of completion
156.74 Reduction, extension, or release of performance surety
156.75 Maintenance of improvements
156.76 Expiration of surety
156.77 Disposition of liquidated securities
Appendices
156.80 Definitions and abbreviations
156.81 Adoption by reference
156.98 Enforcement
156.99 Penalties
Cross-reference:
Building Code, see Chapter 151
Comprehensive Plan, see Chapter 157
Zoning Code, see Chapter 158